IAC logo
IAC Assessment: SU0441
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SU0441
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Syracuse University
Assessment Year 2017
Principal Product Wire and Cable
NAICS 331318 - Other Aluminum Rolling, Drawing, and Extruding
SIC 3357 - Nonferrous Wiredrawing & Insulating
Sales $10,000,000-$50,000,000
# of Employees 95
Plant Area (Sq.Ft.) 144,000
Annual Production 108,000,000 Pounds
Production Hrs. Annual 6,864
Location (State) NY
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $615,775 15,887,583 kWh $0.04
Electricity Demand $408,025 67,213 kW-months/year $6.07
Electricity Fees $35,399 - $ -
Natural Gas $51,751 10,960 MMBtu $4.72
TOTAL ENERGY COSTS $1,110,950
RECOMMENDED SAVINGS* $22,408 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
01: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$3,195
Cost:
-
$3,195 81,917 - - - - - - - - $3,195
81,917
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
02: 3.7312 IMPLEMENT A REGULAR MAINTENANCE PROGRAM TO REDUCE EMISSIONS FROM LEAKY VALVES AND PIPE FITTINGS Savings:
$10,649
Cost:
$1,130
$10,649 273,059 - - - - - - - - $10,649
273,059
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
03: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$3,779
Cost:
$459
- - - - $3,779 838 - - - - -
-
kWh
-
-
kW-months/year
$3,779
838
MMBtu
-
-
$
-
-
$
04: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$3,408
Cost:
$879
$3,408 87,379 - - - - - - - - $3,408
87,379
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
05: 3.1161 ELIMINATE/REDUCE AN OPERATION Savings:
$630
Cost:
$762
$(-31) (-786) $(-546) (-90) - - $446 - $761 - $(-31)
(-786)
kWh
$(-546)
(-90)
kW-months/year
-
-
MMBtu
$446
-
$
$761
-
$
06: 2.7314 REDUCE VENTILATION AIR Savings:
$448
Cost:
$1,147
$152 3,905 - - $296 66 - - - - $152
3,905
kWh
-
-
kW-months/year
$296
66
MMBtu
-
-
$
-
-
$
07: 2.6211 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES Savings:
$299
Cost:
$916
$299 7,664 - - - - - - - - $299
7,664
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$22,408
Cost:
$5,293
$17,672 453,138 $(-546) (-90) $4,075 904 $446 - $761 - $17,672
453,138
kWh
$(-546)
(-90)
kW-months/year
$4,075
904
MMBtu
$446
-
$
$761
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes One-time Revenue or Avoided Cost