Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Syracuse University |
---|---|
Assessment Year | 2021 |
Principal Product | Fabric Cutting Machines |
NAICS | 333249 - Other Industrial Machinery Manufacturing |
SIC | 3559 - Special Industry Machinery, Nec |
Sales | $50,000,000-$100,000,000 |
# of Employees | 122 |
Plant Area (Sq.Ft.) | 130,000 |
Annual Production | 400 Units |
Production Hrs. Annual | 2,210 |
Location (State) | NY |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $41,244 | 890,123 | kWh | $0.05 |
Electricity Demand | $27,864 | 2,841 | kW-months/year | $9.81 |
Electricity Fees | $6,498 | - | $ | - |
Natural Gas | $16,338 | 2,360 | MMBtu | $6.92 |
TOTAL ENERGY COSTS | $91,944 | |||
RECOMMENDED SAVINGS* | $3,109 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | - |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | One-time Revenue or Avoided Cost | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | One-time Revenue or Avoided Cost | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $97 Cost: - |
$97 | 2,117 | - | - | - | - | - | - | - | - |
$97 2,117 kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 3.1161 ELIMINATE/REDUCE AN OPERATION |
Savings: $515 Cost: $50 |
$411 | 8,925 | $368 | 38 | $(-263) | (-38) | - | - | - | - |
$411 8,925 kWh |
$368 38 kW-months/year |
$(-263) (-38) MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7314 REDUCE VENTILATION AIR |
Savings: $1,725 Cost: $882 |
$462 | 10,037 | - | - | $1,263 | 182 | - | - | - | - |
$462 10,037 kWh |
- - kW-months/year |
$1,263 182 MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES |
Savings: $421 Cost: $569 |
$119 | 2,584 | $35 | 4 | - | - | $172 | - | $95 | - |
$119 2,584 kWh |
$35 4 kW-months/year |
- - MMBtu |
$172 - $ |
$95 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES |
Savings: $211 Cost: $371 |
$95 | 2,069 | $110 | 11 | - | - | - | - | $6 | - |
$95 2,069 kWh |
$110 11 kW-months/year |
- - MMBtu |
- - $ |
$6 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $139 Cost: $601 |
$139 | 3,023 | - | - | - | - | - | - | - | - |
$139 3,023 kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $3,109 Cost: $2,473 |
$1,323 | 28,755 | $513 | 52 | $1,000 | 144 | $172 | - | $101 | - | $1,323 28,755 kWh |
$513 52 kW-months/year |
$1,000 144 MMBtu |
$172 - $ |
$101 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: - Cost: - |
- | - | - | - | - | - | - | - | - | - | - - kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | One-time Revenue or Avoided Cost | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | One-time Revenue or Avoided Cost |