IAC logo
IAC Assessment: SU0561
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SU0561
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Syracuse University
Assessment Year 2024
Principal Product Beer, malt beverages, and other beverages
NAICS 312120 - Breweries
SIC 2082 - Malt Beverages
Sales $10,000,000-$50,000,000
# of Employees 137
Plant Area (Sq.Ft.) 350,000
Annual Production 335,623 BBL
Production Hrs. Annual 2,340
Location (State) NY
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $122,226 3,579,627 kWh $0.03
Electricity Demand $132,870 10,699 kW-months/year $12.42
Electricity Fees $3,431 - $ -
Natural Gas $383,175 89,974 MMBtu $4.26
LPG $14,574 414 MMBtu $35.21
Other Gas $7,757 1 MMBtu $7,756.77
TOTAL ENERGY COSTS $664,034
RECOMMENDED SAVINGS* $59,676 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas LPG Personnel Changes One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Natural Gas LPG Personnel Changes One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ MMBtu $ MMBtu $ $ $ $
01: 4.821 PAY BILLS ON TIME TO AVOID LATE FEES Savings:
$295
Cost:
-
- - - - - - - - - - $295 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
$
$295
-
$
02: 2.8121 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES Savings:
$4,133
Cost:
$25
- - - - - - - - - - $4,133 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
$
$4,133
-
$
03: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$2,051
Cost:
$390
$1,384 40,705 - - $667 148 - - - - - - $1,384
40,705
kWh
-
-
kW-months/year
$667
148
MMBtu
-
-
MMBtu
-
-
$
-
-
$
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$326
Cost:
$95
$326 9,600 - - - - - - - - - - $326
9,600
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
$
-
-
$
05: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$4,166
Cost:
$2,943
- - - - $4,166 922 - - - - - - -
-
kWh
-
-
kW-months/year
$4,166
922
MMBtu
-
-
MMBtu
-
-
$
-
-
$
06: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$1,218
Cost:
$995
$1,218 35,821 - - - - - - - - - - $1,218
35,821
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
$
-
-
$
07: 3.7312 IMPLEMENT A REGULAR MAINTENANCE PROGRAM TO REDUCE EMISSIONS FROM LEAKY VALVES AND PIPE FITTINGS Savings:
$1,101
Cost:
$1,100
$1,101 32,395 - - - - - - - - - - $1,101
32,395
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
$
-
-
$
08: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES Savings:
$704
Cost:
$1,196
$225 6,630 $113 9 - - - - $88 - $278 - $225
6,630
kWh
$113
9
kW-months/year
-
-
MMBtu
-
-
MMBtu
$88
-
$
$278
-
$
09: 2.8227 ADJUST / MAINTAIN FORK LIFT TRUCKS FOR MOST EFFICIENT OPERATION Savings:
$13,655
Cost:
$30,000
$(-918) (-24,820) - - - - $14,574 414 - - - - $(-918)
(-24,820)
kWh
-
-
kW-months/year
-
-
MMBtu
$14,574
414
MMBtu
-
-
$
-
-
$
10: 2.6211 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES Savings:
$170
Cost:
$556
$170 4,599 - - - - - - - - - - $170
4,599
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
$
-
-
$
11: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY Savings:
$31,857
Cost:
$400,736
$31,857 860,994 - - - - - - - - - - $31,857
860,994
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$59,676
Cost:
$438,036
$35,364 965,923 $113 9 $4,832 1,070 $14,574 414 $88 - $4,706 - $35,364
965,923
kWh
$113
9
kW-months/year
$4,832
1,070
MMBtu
$14,574
414
MMBtu
$88
-
$
$4,706
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Natural Gas LPG Personnel Changes One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Natural Gas LPG Personnel Changes One-time Revenue or Avoided Cost