IAC logo
IAC Assessment: TN0145
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: TN0145
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Tennessee
Assessment Year 1982
Principal Product EXPANDABLE POLYSTYRENE
NAICS n/a
SIC 3089 - Plastics Products, Nec
Sales $1,000,000-$5,000,000
# of Employees 15
Plant Area (Sq.Ft.) 0
Annual Production 10,000 Thousand Feet
Production Hrs. Annual 0
Location (State) TN
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $3,007 52,462 kWh $0.06
Natural Gas $17,206 4,337 MMBtu $3.97
TOTAL ENERGY COSTS $20,213
RECOMMENDED SAVINGS* $2,419 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Natural Gas Natural Gas
$ MMBtu
01: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$2,025
Cost:
$500
$2,025 510 $2,025
510
MMBtu
02: 2.2135 REPAIR AND ELIMINATE STEAM LEAKS Savings:
$258
Cost:
-
$258 65 $258
65
MMBtu
03: 2.7492 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE Savings:
$136
Cost:
$100
$136 34 $136
34
MMBtu
TOTAL RECOMMENDED Savings:
$2,419
Cost:
$600
$2,419 609 $2,419
609
MMBtu
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - -
-
MMBtu
Savings
Cost
$ MMBtu
Natural Gas Natural Gas