Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Tennessee |
---|---|
Assessment Year | 1983 |
Principal Product | WOODEN CABINETS |
NAICS | n/a |
SIC | 2517 - Wood Tv And Radio Cabinets |
Sales | n/a |
# of Employees | 1,500 |
Plant Area (Sq.Ft.) | 0 |
Annual Production | 500,000 Pieces |
Production Hrs. Annual | 4,420 |
Location (State) | TN |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $729,733 | 15,715,123 | kWh | $0.05 |
Natural Gas | $67,504 | 16,018 | MMBtu | $4.21 |
Fuel Oil #2 | $216,832 | 29,149 | MMBtu | $7.44 |
TOTAL ENERGY COSTS | $1,014,069 | |||
RECOMMENDED SAVINGS* | $310,317 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | - |
#|Description |
Savings Cost |
Status | Natural Gas | Fuel Oil #2 | Natural Gas | Fuel Oil #2 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | MMBtu | $ | MMBtu | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7314 REDUCE VENTILATION AIR |
Savings: $23,801 Cost: $11,000 |
- | - | $23,801 | 3,204 |
- - MMBtu |
$23,801 3,204 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 3.6123 BURN WOOD BY-PRODUCTS FOR HEAT |
Savings: $250,513 Cost: $1,000,000 |
$67,058 | 15,966 | $183,455 | 24,696 |
$67,058 15,966 MMBtu |
$183,455 24,696 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7212 INSTALL OR UPGRADE INSULATION ON HVAC DISTRIBUTION SYSTEMS |
Savings: $30,929 Cost: $32,300 |
$8,287 | 1,973 | $22,642 | 3,048 |
$8,287 1,973 MMBtu |
$22,642 3,048 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7314 REDUCE VENTILATION AIR |
Savings: $5,074 Cost: $18,612 |
$1,360 | 324 | $3,714 | 500 |
$1,360 324 MMBtu |
$3,714 500 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $310,317 Cost: $1,061,912 |
$76,705 | 18,263 | $233,612 | 31,448 | $76,705 18,263 MMBtu |
$233,612 31,448 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: - Cost: - |
- | - | - | - | - - MMBtu |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | MMBtu | $ | MMBtu | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Natural Gas | Fuel Oil #2 | Natural Gas | Fuel Oil #2 |