IAC logo
IAC Assessment: TN0178
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: TN0178
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Tennessee
Assessment Year 1983
Principal Product TIRE BUILDING, DRUMS
NAICS n/a
SIC 3545 - Machine Tool Accessories
Sales $1,000,000-$5,000,000
# of Employees 30
Plant Area (Sq.Ft.) 0
Annual Production 500 Pieces
Production Hrs. Annual 2,210
Location (State) TN
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $12,902 172,919 kWh $0.07
LPG $6,353 641 MMBtu $9.91
TOTAL ENERGY COSTS $19,255
RECOMMENDED SAVINGS* $6,216 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage LPG Electricity Usage LPG
$ kWh $ MMBtu
01: 2.7444 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS Savings:
$2,560
Cost:
$500
- - $2,560 270 -
-
kWh
$2,560
270
MMBtu
02: 2.7133 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE Savings:
$586
Cost:
$500
$586 11,723 - - $586
11,723
kWh
-
-
MMBtu
03: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$3,070
Cost:
-
- - $3,070 323 -
-
kWh
$3,070
323
MMBtu
TOTAL RECOMMENDED Savings:
$6,216
Cost:
$1,000
$586 11,723 $5,630 593 $586
11,723
kWh
$5,630
593
MMBtu
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - -
-
kWh
-
-
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage LPG Electricity Usage LPG