Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Tennessee |
---|---|
Assessment Year | 1983 |
Principal Product | HOISERY & SLIPPER SOCKS |
NAICS | n/a |
SIC | 2252 - Hosiery, Nec |
Sales | $5,000,000-$10,000,000 |
# of Employees | 175 |
Plant Area (Sq.Ft.) | 0 |
Annual Production | 900,000 Pieces |
Production Hrs. Annual | 6,000 |
Location (State) | TN |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $93,126 | 1,753,224 | kWh | $0.05 |
Natural Gas | $121,630 | 23,354 | MMBtu | $5.21 |
Fuel Oil #2 | $16,674 | 2,223 | MMBtu | $7.50 |
TOTAL ENERGY COSTS | $231,430 | |||
RECOMMENDED SAVINGS* | $27,093 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $25,825 |
#|Description |
Savings Cost |
Status | Natural Gas | Fuel Oil #2 | Administrative Changes | Natural Gas | Fuel Oil #2 | Administrative Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | MMBtu | $ | MMBtu | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO |
Savings: $12,515 Cost: $527 |
$11,440 | 2,200 | $1,575 | 210 | $(-500) | - |
$11,440 2,200 MMBtu |
$1,575 210 MMBtu |
$(-500) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.2441 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT |
Savings: $9,500 Cost: $5,000 |
$8,350 | 1,606 | $1,150 | 153 | - | - |
$8,350 1,606 MMBtu |
$1,150 153 MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES |
Savings: $3,810 Cost: $2,000 |
$3,350 | 644 | $460 | 61 | - | - |
$3,350 644 MMBtu |
$460 61 MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $1,268 Cost: $1,790 |
$1,115 | 214 | $153 | 20 | - | - |
$1,115 214 MMBtu |
$153 20 MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $27,093 Cost: $9,317 |
$24,255 | 4,664 | $3,338 | 444 | $(-500) | - | $24,255 4,664 MMBtu |
$3,338 444 MMBtu |
$(-500) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $25,825 Cost: $7,527 |
$23,140 | 4,450 | $3,185 | 424 | $(-500) | - | $23,140 4,450 MMBtu |
$3,185 424 MMBtu |
$(-500) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | MMBtu | $ | MMBtu | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Natural Gas | Fuel Oil #2 | Administrative Changes | Natural Gas | Fuel Oil #2 | Administrative Changes |