IAC logo
IAC Assessment: TN0203
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: TN0203
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Tennessee
Assessment Year 1984
Principal Product AUTO A/C & EVAPORATORS
NAICS n/a
SIC 3585 - Refrigeration And Heating Equipment
Sales $10,000,000-$50,000,000
# of Employees 435
Plant Area (Sq.Ft.) 0
Annual Production 1,200,000 Pieces
Production Hrs. Annual 0
Location (State) TN
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $262,557 5,482,708 kWh $0.05
Natural Gas $332,517 66,450 MMBtu $5.00
TOTAL ENERGY COSTS $595,074
RECOMMENDED SAVINGS* $83,584 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $61,664
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.2444 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS Savings:
$49,685
Cost:
$7,200
- - $49,685 9,937 -
-
kWh
$49,685
9,937
MMBtu
02: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$21,920
Cost:
-
- - $21,920 4,384 -
-
kWh
$21,920
4,384
MMBtu
03: 2.6122 ADJUST VENTS TO MINIMIZE ENERGY USE Savings:
$7,310
Cost:
$20,000
- - $7,310 1,462 -
-
kWh
$7,310
1,462
MMBtu
04: 2.2511 INSULATE BARE EQUIPMENT Savings:
$2,840
Cost:
$232
$2,840 94,666 - - $2,840
94,666
kWh
-
-
MMBtu
05: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$1,679
Cost:
-
$1,679 55,979 - - $1,679
55,979
kWh
-
-
MMBtu
06: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$150
Cost:
$200
- - $150 30 -
-
kWh
$150
30
MMBtu
TOTAL RECOMMENDED Savings:
$83,584
Cost:
$27,632
$4,519 150,645 $79,065 15,813 $4,519
150,645
kWh
$79,065
15,813
MMBtu
TOTAL IMPLEMENTED Savings:
$61,664
Cost:
$27,632
$4,519 150,645 $57,145 11,429 $4,519
150,645
kWh
$57,145
11,429
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas