DOE MESC
IAC logo
IAC Assessment: TN0217
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Tennessee
Assessment Year 1984
Principal Product MATTING/RUBBER PRODUCTS
NAICS n/a
SIC 3069 - Fabricated Rubber Products, Nec
Sales $10,000,000-$50,000,000
# of Employees 198
Plant Area (Sq.Ft.) 0
Annual Production 30,000,000 Pounds
Production Hrs. Annual 7,488
Location (State) TN
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $291,546 5,206,038 kWh $0.06
Natural Gas $552,027 112,469 MMBtu $4.91
TOTAL ENERGY COSTS $843,573
RECOMMENDED SAVINGS* $127,758 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $66,011
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 2.2441 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT Savings:
$51,259
Cost:
$42,740
- - $51,259 10,461 - - -
-
kWh
$51,259
10,461
MMBtu
-
-
$
02: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$24,926
Cost:
$1,300
- - $24,926 5,087 - - -
-
kWh
$24,926
5,087
MMBtu
-
-
$
03: 2.2135 REPAIR AND ELIMINATE STEAM LEAKS Savings:
$22,604
Cost:
$1,425
- - $22,604 4,613 - - -
-
kWh
$22,604
4,613
MMBtu
-
-
$
04: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$12,424
Cost:
$1,200
- - $13,624 2,781 $(-1,200) - -
-
kWh
$13,624
2,781
MMBtu
$(-1,200)
-
$
05: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$10,488
Cost:
-
$10,488 187,573 - - - - $10,488
187,573
kWh
-
-
MMBtu
-
-
$
06: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$3,447
Cost:
-
$3,447 61,547 - - - - $3,447
61,547
kWh
-
-
MMBtu
-
-
$
07: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,610
Cost:
$50
$2,610 46,600 - - - - $2,610
46,600
kWh
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$127,758
Cost:
$46,715
$16,545 295,720 $112,413 22,942 $(-1,200) - $16,545
295,720
kWh
$112,413
22,942
MMBtu
$(-1,200)
-
$
TOTAL IMPLEMENTED Savings:
$66,011
Cost:
$3,975
$6,057 108,147 $61,154 12,481 $(-1,200) - $6,057
108,147
kWh
$61,154
12,481
MMBtu
$(-1,200)
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes