IAC logo
IAC Assessment: TN0220
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: TN0220
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Tennessee
Assessment Year 1984
Principal Product CONVEYOR BELTING
NAICS n/a
SIC 3052 - Rubber & Plastics Hose & Belting
Sales $10,000,000-$50,000,000
# of Employees 200
Plant Area (Sq.Ft.) 0
Annual Production 100,000 Thousand Feet
Production Hrs. Annual 8,736
Location (State) TN
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $860,070 20,196,952 kWh $0.04
Natural Gas $110,553 20,174 MMBtu $5.48
TOTAL ENERGY COSTS $970,623
RECOMMENDED SAVINGS* $101,251 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $65,971
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.7221 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA Savings:
$16,500
Cost:
$29,700
- - $16,500 3,000 -
-
kWh
$16,500
3,000
MMBtu
02: 2.2511 INSULATE BARE EQUIPMENT Savings:
$35,035
Cost:
$750
$35,035 814,771 - - $35,035
814,771
kWh
-
-
MMBtu
03: 2.2515 USE OPTIMUM THICKNESS INSULATION Savings:
$23,700
Cost:
$4,570
$23,700 550,996 - - $23,700
550,996
kWh
-
-
MMBtu
04: 2.6232 INSTALL SET-BACK TIMERS Savings:
$18,780
Cost:
-
$18,780 436,694 - - $18,780
436,694
kWh
-
-
MMBtu
05: 2.2511 INSULATE BARE EQUIPMENT Savings:
$6,330
Cost:
$400
$6,330 147,128 - - $6,330
147,128
kWh
-
-
MMBtu
06: 2.2511 INSULATE BARE EQUIPMENT Savings:
$680
Cost:
$250
$680 15,826 - - $680
15,826
kWh
-
-
MMBtu
07: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$226
Cost:
-
- - $226 41 -
-
kWh
$226
41
MMBtu
TOTAL RECOMMENDED Savings:
$101,251
Cost:
$35,670
$84,525 1,965,415 $16,726 3,041 $84,525
1,965,415
kWh
$16,726
3,041
MMBtu
TOTAL IMPLEMENTED Savings:
$65,971
Cost:
$5,970
$65,745 1,528,721 $226 41 $65,745
1,528,721
kWh
$226
41
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas