Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Tennessee |
---|---|
Assessment Year | 1984 |
Principal Product | FURNITURE |
NAICS | n/a |
SIC | 2511 - Wood Household Furniture |
Sales | $10,000,000-$50,000,000 |
# of Employees | 300 |
Plant Area (Sq.Ft.) | 0 |
Annual Production | 4,000,000 Pieces |
Production Hrs. Annual | 4,160 |
Location (State) | KY |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $288,537 | 4,475,088 | kWh | $0.06 |
Natural Gas | $9,957 | 2,676 | MMBtu | $3.72 |
Wood | $27,824 | 63,640 | MMBtu | $0.44 |
TOTAL ENERGY COSTS | $326,318 | |||
RECOMMENDED SAVINGS* | $196,900 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $25,064 |
#|Description |
Savings Cost |
Status | Electricity Usage | Natural Gas | Wood | Administrative Changes | Electricity Usage | Natural Gas | Wood | Administrative Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | $ | MMBtu | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.3413 BURN FOSSIL FUEL TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR AND USE STEAM EXHAUST FOR HEAT |
Savings: $171,149 Cost: $240,000 |
$162,240 | 2,495,897 | $8,909 | 2,408 | - | - | - | - |
$162,240 2,495,897 kWh |
$8,909 2,408 MMBtu |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO |
Savings: $8,367 Cost: - |
- | - | $148 | 40 | $8,719 | 18,600 | $(-500) | - |
- - kWh |
$148 40 MMBtu |
$8,719 18,600 MMBtu |
$(-500) - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $1,224 Cost: $1,817 |
- | - | $22 | 6 | $1,202 | 2,564 | - | - |
- - kWh |
$22 6 MMBtu |
$1,202 2,564 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.2163 USE MINIMUM STEAM OPERATING PRESSURE |
Savings: $687 Cost: - |
- | - | $11 | 3 | $676 | 1,441 | - | - |
- - kWh |
$11 3 MMBtu |
$676 1,441 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME |
Savings: $14,520 Cost: $3,000 |
$14,520 | 223,329 | - | - | - | - | - | - |
$14,520 223,329 kWh |
- - MMBtu |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $953 Cost: $270 |
$953 | 14,654 | - | - | - | - | - | - |
$953 14,654 kWh |
- - MMBtu |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $196,900 Cost: $245,087 |
$177,713 | 2,733,880 | $9,090 | 2,457 | $10,597 | 22,605 | $(-500) | - | $177,713 2,733,880 kWh |
$9,090 2,457 MMBtu |
$10,597 22,605 MMBtu |
$(-500) - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $25,064 Cost: $5,087 |
$15,473 | 237,983 | $170 | 46 | $9,921 | 21,164 | $(-500) | - | $15,473 237,983 kWh |
$170 46 MMBtu |
$9,921 21,164 MMBtu |
$(-500) - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | $ | MMBtu | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Natural Gas | Wood | Administrative Changes | Electricity Usage | Natural Gas | Wood | Administrative Changes |