IAC Assessment: TN0225
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: TN0225
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Tennessee
Assessment Year 1984
Principal Product STEEL JOINTS
NAICS n/a
SIC 3441 - Fabricated Structural Metal
Sales $5,000,000-$10,000,000
# of Employees 120
Plant Area (Sq.Ft.) 0
Annual Production 6,000 Tons
Production Hrs. Annual 4,290
Location (State) TN
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $108,430 1,892,145 kWh $0.06
LPG $17,803 2,061 MMBtu $8.64
Fuel Oil #2 $9,500 1,330 MMBtu $7.14
TOTAL ENERGY COSTS $135,733
RECOMMENDED SAVINGS* $40,991 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Natural Gas Fuel Oil #2 Administrative Changes Electricity Usage Natural Gas Fuel Oil #2 Administrative Changes
$ kWh $ MMBtu $ MMBtu $ $
01: 2.1321 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT Savings:
$5,090
Cost:
$13,000
$(-4,410) (-77,374) - - $9,500 1,273 - - $(-4,410)
(-77,374)
kWh
-
-
MMBtu
$9,500
1,273
MMBtu
-
-
$
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$7,768
Cost:
$95
$7,768 136,284 - - - - - - $7,768
136,284
kWh
-
-
MMBtu
-
-
MMBtu
-
-
$
03: 2.7121 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT Savings:
$6,670
Cost:
-
$6,670 116,940 - - - - - - $6,670
116,940
kWh
-
-
MMBtu
-
-
MMBtu
-
-
$
04: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$1,236
Cost:
$500
$1,236 21,688 - - - - - - $1,236
21,688
kWh
-
-
MMBtu
-
-
MMBtu
-
-
$
05: 2.4222 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN Savings:
$18,012
Cost:
$10,000
$322 5,569 - - - - $17,690 - $322
5,569
kWh
-
-
MMBtu
-
-
MMBtu
$17,690
-
$
06: 2.7221 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA Savings:
$1,056
Cost:
-
$1,056 18,464 - - - - - - $1,056
18,464
kWh
-
-
MMBtu
-
-
MMBtu
-
-
$
07: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$1,159
Cost:
$3,500
$1,854 32,532 $(-695) (-139) - - - - $1,854
32,532
kWh
$(-695)
(-139)
MMBtu
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$40,991
Cost:
$27,095
$14,496 254,103 $(-695) (-139) $9,500 1,273 $17,690 - $14,496
254,103
kWh
$(-695)
(-139)
MMBtu
$9,500
1,273
MMBtu
$17,690
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - -
-
kWh
-
-
MMBtu
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ MMBtu $ MMBtu $ $
Electricity Usage Natural Gas Fuel Oil #2 Administrative Changes Electricity Usage Natural Gas Fuel Oil #2 Administrative Changes