IAC Assessment: TN0227
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: TN0227
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Tennessee
Assessment Year 1984
Principal Product WOOD LAMINANTS
NAICS n/a
SIC 2491 - Wood Preserving
Sales $5,000,000-$10,000,000
# of Employees 85
Plant Area (Sq.Ft.) 0
Annual Production 6,000 Tons
Production Hrs. Annual 4,160
Location (State) TN
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $117,198 2,082,943 kWh $0.06
Natural Gas $102,572 21,539 MMBtu $4.76
Fuel Oil #2 $7,750 1,085 MMBtu $7.14
TOTAL ENERGY COSTS $227,520
RECOMMENDED SAVINGS* $27,076 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $19,058
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$7,818
Cost:
$3,675
$4,914 87,339 $2,904 610 - - $4,914
87,339
kWh
$2,904
610
MMBtu
-
-
$
02: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$12,425
Cost:
-
$12,425 218,054 - - - - $12,425
218,054
kWh
-
-
MMBtu
-
-
$
03: 2.2511 INSULATE BARE EQUIPMENT Savings:
$3,155
Cost:
$5,000
- - $3,155 631 - - -
-
kWh
$3,155
631
MMBtu
-
-
$
04: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$755
Cost:
-
- - $1,055 271 $(-300) - -
-
kWh
$1,055
271
MMBtu
$(-300)
-
$
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,656
Cost:
$25
$2,656 46,600 - - - - $2,656
46,600
kWh
-
-
MMBtu
-
-
$
06: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$200
Cost:
-
$200 3,517 - - - - $200
3,517
kWh
-
-
MMBtu
-
-
$
07: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$67
Cost:
-
$67 1,172 - - - - $67
1,172
kWh
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$27,076
Cost:
$8,700
$20,262 356,682 $7,114 1,512 $(-300) - $20,262
356,682
kWh
$7,114
1,512
MMBtu
$(-300)
-
$
TOTAL IMPLEMENTED Savings:
$19,058
Cost:
$5,025
$15,148 265,826 $4,210 902 $(-300) - $15,148
265,826
kWh
$4,210
902
MMBtu
$(-300)
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes