IAC logo
IAC Assessment: TN0229
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: TN0229
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Tennessee
Assessment Year 1984
Principal Product POLYETHYLENE PIPE
NAICS n/a
SIC 3084 - Plastics Pipe
Sales $1,000,000-$5,000,000
# of Employees 36
Plant Area (Sq.Ft.) 0
Annual Production 3,000,000 Pounds
Production Hrs. Annual 6,240
Location (State) TN
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $90,327 1,550,117 kWh $0.06
Natural Gas $3,724 622 MMBtu $5.99
TOTAL ENERGY COSTS $94,051
RECOMMENDED SAVINGS* $8,332 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $232
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.2511 INSULATE BARE EQUIPMENT Savings:
$3,128
Cost:
$340
$3,128 53,927 - - $3,128
53,927
kWh
-
-
MMBtu
02: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$2,384
Cost:
$360
$2,006 34,584 $378 63 $2,006
34,584
kWh
$378
63
MMBtu
03: 2.7441 REPLACE BROKEN WINDOWS AND/OR WINDOW SASH Savings:
$786
Cost:
$800
- - $786 131 -
-
kWh
$786
131
MMBtu
04: 2.6232 INSTALL SET-BACK TIMERS Savings:
$1,802
Cost:
-
$1,802 31,067 - - $1,802
31,067
kWh
-
-
MMBtu
05: 2.2511 INSULATE BARE EQUIPMENT Savings:
$96
Cost:
$26
- - $96 16 -
-
kWh
$96
16
MMBtu
06: 2.6124 ESTABLISH EQUIPMENT MAINTENANCE SCHEDULE Savings:
$136
Cost:
-
$136 2,345 - - $136
2,345
kWh
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$8,332
Cost:
$1,526
$7,072 121,923 $1,260 210 $7,072
121,923
kWh
$1,260
210
MMBtu
TOTAL IMPLEMENTED Savings:
$232
Cost:
$26
$136 2,345 $96 16 $136
2,345
kWh
$96
16
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas