IAC Assessment: TN0231
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: TN0231
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Tennessee
Assessment Year 1984
Principal Product UNIFORMS
NAICS n/a
SIC 2325 - Men's and Boys' Separate Trousers and Slacks
Sales $1,000,000-$5,000,000
# of Employees 200
Plant Area (Sq.Ft.) 0
Annual Production 526,000 Pieces
Production Hrs. Annual 2,125
Location (State) TN
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $32,531 528,136 kWh $0.06
Natural Gas $48,535 8,271 MMBtu $5.87
TOTAL ENERGY COSTS $81,066
RECOMMENDED SAVINGS* $15,134 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $7,414
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$7,322
Cost:
$500
- - $7,322 1,241 - - -
-
kWh
$7,322
1,241
MMBtu
-
-
$
02: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$4,342
Cost:
$3,285
- - $4,342 736 - - -
-
kWh
$4,342
736
MMBtu
-
-
$
03: 2.6232 INSTALL SET-BACK TIMERS Savings:
$1,771
Cost:
-
$1,771 28,722 - - - - $1,771
28,722
kWh
-
-
MMBtu
-
-
$
04: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$113
Cost:
$400
- - $513 87 $(-400) - -
-
kWh
$513
87
MMBtu
$(-400)
-
$
05: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$922
Cost:
-
$922 14,947 - - - - $922
14,947
kWh
-
-
MMBtu
-
-
$
06: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$124
Cost:
$42
- - $124 21 - - -
-
kWh
$124
21
MMBtu
-
-
$
07: 2.2511 INSULATE BARE EQUIPMENT Savings:
$142
Cost:
$205
- - $142 24 - - -
-
kWh
$142
24
MMBtu
-
-
$
08: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$398
Cost:
-
$398 6,448 - - - - $398
6,448
kWh
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$15,134
Cost:
$4,432
$3,091 50,117 $12,443 2,109 $(-400) - $3,091
50,117
kWh
$12,443
2,109
MMBtu
$(-400)
-
$
TOTAL IMPLEMENTED Savings:
$7,414
Cost:
$3,932
$2,693 43,669 $5,121 868 $(-400) - $2,693
43,669
kWh
$5,121
868
MMBtu
$(-400)
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes