Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Tennessee |
---|---|
Assessment Year | 1985 |
Principal Product | PANTS & SHORTS |
NAICS | n/a |
SIC | 2339 - Women's, Misses', and Juniors' Outerwear, Not Elsewhere Classified |
Sales | $1,000,000-$5,000,000 |
# of Employees | 283 |
Plant Area (Sq.Ft.) | 0 |
Annual Production | 1,032,000 Pieces |
Production Hrs. Annual | 3,772 |
Location (State) | TN |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $86,990 | 1,468,933 | kWh | $0.06 |
Fuel Oil #2 | $51,029 | 7,280 | MMBtu | $7.01 |
TOTAL ENERGY COSTS | $138,019 | |||
RECOMMENDED SAVINGS* | $22,169 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $19,863 |
#|Description |
Savings Cost |
Status | Electricity Usage | Fuel Oil #2 | Administrative Changes | Electricity Usage | Fuel Oil #2 | Administrative Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES |
Savings: $5,632 Cost: $232 |
$1,452 | 24,619 | $4,180 | 596 | - | - |
$1,452 24,619 kWh |
$4,180 596 MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO |
Savings: $3,837 Cost: - |
- | - | $4,737 | 676 | $(-900) | - |
- - kWh |
$4,737 676 MMBtu |
$(-900) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS |
Savings: $6,185 Cost: - |
$6,185 | 104,924 | - | - | - | - |
$6,185 104,924 kWh |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.1131 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC |
Savings: $1,176 Cost: $400 |
- | - | $1,176 | 168 | - | - |
- - kWh |
$1,176 168 MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $3,233 Cost: $225 |
$3,233 | 54,807 | - | - | - | - |
$3,233 54,807 kWh |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.2135 REPAIR AND ELIMINATE STEAM LEAKS |
Savings: $976 Cost: $29 |
$191 | 3,224 | $785 | 112 | - | - |
$191 3,224 kWh |
$785 112 MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $1,130 Cost: $214 |
$366 | 6,155 | $764 | 109 | - | - |
$366 6,155 kWh |
$764 109 MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $22,169 Cost: $1,100 |
$11,427 | 193,729 | $11,642 | 1,661 | $(-900) | - | $11,427 193,729 kWh |
$11,642 1,661 MMBtu |
$(-900) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $19,863 Cost: $486 |
$11,061 | 187,574 | $9,702 | 1,384 | $(-900) | - | $11,061 187,574 kWh |
$9,702 1,384 MMBtu |
$(-900) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Fuel Oil #2 | Administrative Changes | Electricity Usage | Fuel Oil #2 | Administrative Changes |