IAC logo
IAC Assessment: TN0245
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: TN0245
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Tennessee
Assessment Year 1985
Principal Product PANTS & SHORTS
NAICS n/a
SIC 2339 - Women's, Misses', and Juniors' Outerwear, Not Elsewhere Classified
Sales $1,000,000-$5,000,000
# of Employees 283
Plant Area (Sq.Ft.) 0
Annual Production 1,032,000 Pieces
Production Hrs. Annual 3,772
Location (State) TN
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $86,990 1,468,933 kWh $0.06
Fuel Oil #2 $51,029 7,280 MMBtu $7.01
TOTAL ENERGY COSTS $138,019
RECOMMENDED SAVINGS* $22,169 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $19,863
#|Description Savings
Cost
Status Electricity Usage Fuel Oil #2 Administrative Changes Electricity Usage Fuel Oil #2 Administrative Changes
$ kWh $ MMBtu $ $
01: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$5,632
Cost:
$232
$1,452 24,619 $4,180 596 - - $1,452
24,619
kWh
$4,180
596
MMBtu
-
-
$
02: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$3,837
Cost:
-
- - $4,737 676 $(-900) - -
-
kWh
$4,737
676
MMBtu
$(-900)
-
$
03: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$6,185
Cost:
-
$6,185 104,924 - - - - $6,185
104,924
kWh
-
-
MMBtu
-
-
$
04: 2.1131 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC Savings:
$1,176
Cost:
$400
- - $1,176 168 - - -
-
kWh
$1,176
168
MMBtu
-
-
$
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$3,233
Cost:
$225
$3,233 54,807 - - - - $3,233
54,807
kWh
-
-
MMBtu
-
-
$
06: 2.2135 REPAIR AND ELIMINATE STEAM LEAKS Savings:
$976
Cost:
$29
$191 3,224 $785 112 - - $191
3,224
kWh
$785
112
MMBtu
-
-
$
07: 2.2511 INSULATE BARE EQUIPMENT Savings:
$1,130
Cost:
$214
$366 6,155 $764 109 - - $366
6,155
kWh
$764
109
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$22,169
Cost:
$1,100
$11,427 193,729 $11,642 1,661 $(-900) - $11,427
193,729
kWh
$11,642
1,661
MMBtu
$(-900)
-
$
TOTAL IMPLEMENTED Savings:
$19,863
Cost:
$486
$11,061 187,574 $9,702 1,384 $(-900) - $11,061
187,574
kWh
$9,702
1,384
MMBtu
$(-900)
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Fuel Oil #2 Administrative Changes Electricity Usage Fuel Oil #2 Administrative Changes