IAC logo
IAC Assessment: TN0255
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: TN0255
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Tennessee
Assessment Year 1985
Principal Product NEWSPAPERS,AD CIRCULARS
NAICS n/a
SIC 2711 - Newspapers
Sales $1,000,000-$5,000,000
# of Employees 35
Plant Area (Sq.Ft.) 0
Annual Production 3,400,000 Pieces
Production Hrs. Annual 4,160
Location (State) TN
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $9,721 116,061 kWh $0.08
TOTAL ENERGY COSTS $9,721
RECOMMENDED SAVINGS* $3,550 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $1,836
#|Description Savings
Cost
Status Electricity Usage Electricity Usage
$ kWh
01: 2.7234 USE HEAT PUMP FOR SPACE CONDITIONING Savings:
$1,340
Cost:
$2,000
$1,340 24,033 $1,340
24,033
kWh
02: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$1,207
Cost:
$1,640
$1,207 20,809 $1,207
20,809
kWh
03: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$340
Cost:
$250
$340 5,862 $340
5,862
kWh
04: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$255
Cost:
$560
$255 4,396 $255
4,396
kWh
05: 2.7492 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE Savings:
$238
Cost:
$265
$238 4,103 $238
4,103
kWh
06: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$119
Cost:
-
$119 2,052 $119
2,052
kWh
07: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$51
Cost:
-
$51 879 $51
879
kWh
TOTAL RECOMMENDED Savings:
$3,550
Cost:
$4,715
$3,550 62,134 $3,550
62,134
kWh
TOTAL IMPLEMENTED Savings:
$1,836
Cost:
$2,155
$1,836 31,653 $1,836
31,653
kWh