IAC logo
IAC Assessment: TN0266
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: TN0266
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Tennessee
Assessment Year 1985
Principal Product SOFT DRINKS,BOTTLES&CANS
NAICS n/a
SIC 2086 - Bottled And Canned Soft Drinks
Sales $10,000,000-$50,000,000
# of Employees 425
Plant Area (Sq.Ft.) 0
Annual Production 10,000,000 Pieces
Production Hrs. Annual 2,060
Location (State) TN
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $214,763 4,366,940 kWh $0.05
Natural Gas $111,236 22,607 MMBtu $4.92
TOTAL ENERGY COSTS $325,999
RECOMMENDED SAVINGS* $26,446 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $9,023
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$16,052
Cost:
$15,200
- - $16,052 3,276 -
-
kWh
$16,052
3,276
MMBtu
02: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$2,445
Cost:
$600
- - $2,445 499 -
-
kWh
$2,445
499
MMBtu
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,958
Cost:
$375
$2,958 60,375 - - $2,958
60,375
kWh
-
-
MMBtu
04: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$2,054
Cost:
-
$2,054 41,911 - - $2,054
41,911
kWh
-
-
MMBtu
05: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$1,077
Cost:
-
$1,077 21,981 - - $1,077
21,981
kWh
-
-
MMBtu
06: 2.7121 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT Savings:
$948
Cost:
$2,300
$948 19,343 - - $948
19,343
kWh
-
-
MMBtu
07: 2.2511 INSULATE BARE EQUIPMENT Savings:
$294
Cost:
$350
- - $294 60 -
-
kWh
$294
60
MMBtu
08: 2.6232 INSTALL SET-BACK TIMERS Savings:
$618
Cost:
-
$618 12,603 - - $618
12,603
kWh
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$26,446
Cost:
$18,825
$7,655 156,213 $18,791 3,835 $7,655
156,213
kWh
$18,791
3,835
MMBtu
TOTAL IMPLEMENTED Savings:
$9,023
Cost:
$3,275
$6,578 134,232 $2,445 499 $6,578
134,232
kWh
$2,445
499
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas