IAC logo
IAC Assessment: TN0272
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: TN0272
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Tennessee
Assessment Year 1986
Principal Product TELEVISION SETS
NAICS n/a
SIC 3651 - Household Audio And Video Equipment
Sales $100,000,000-$500,000,000
# of Employees 350
Plant Area (Sq.Ft.) 0
Annual Production 720,000 Pieces
Production Hrs. Annual 2,040
Location (State) TN
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $161,150 3,203,986 kWh $0.05
Natural Gas $7,558 1,457 MMBtu $5.19
Fuel Oil #2 $12,546 2,240 MMBtu $5.60
TOTAL ENERGY COSTS $181,254
RECOMMENDED SAVINGS* $5,623 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $4,547
#|Description Savings
Cost
Status Electricity Usage Natural Gas Fuel Oil #2 Electricity Usage Natural Gas Fuel Oil #2
$ kWh $ MMBtu $ MMBtu
01: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$1,076
Cost:
$3,600
- - $1,076 207 - - -
-
kWh
$1,076
207
MMBtu
-
-
MMBtu
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,110
Cost:
$750
$2,110 42,204 - - - - $2,110
42,204
kWh
-
-
MMBtu
-
-
MMBtu
03: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$1,861
Cost:
$440
$1,861 37,222 - - - - $1,861
37,222
kWh
-
-
MMBtu
-
-
MMBtu
04: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$576
Cost:
$448
$322 6,448 - - $254 45 $322
6,448
kWh
-
-
MMBtu
$254
45
MMBtu
TOTAL RECOMMENDED Savings:
$5,623
Cost:
$5,238
$4,293 85,874 $1,076 207 $254 45 $4,293
85,874
kWh
$1,076
207
MMBtu
$254
45
MMBtu
TOTAL IMPLEMENTED Savings:
$4,547
Cost:
$1,638
$4,293 85,874 - - $254 45 $4,293
85,874
kWh
-
-
MMBtu
$254
45
MMBtu
Savings
Cost
$ kWh $ MMBtu $ MMBtu
Electricity Usage Natural Gas Fuel Oil #2 Electricity Usage Natural Gas Fuel Oil #2