IAC logo
IAC Assessment: TN0285
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: TN0285
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Tennessee
Assessment Year 1986
Principal Product FINISHED TEXTILE YARN
NAICS n/a
SIC 2281 - Yarn Spinning Mills
Sales $10,000,000-$50,000,000
# of Employees 300
Plant Area (Sq.Ft.) 0
Annual Production 11,252,398 Pounds
Production Hrs. Annual 6,000
Location (State) TN
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $697,717 14,829,133 kWh $0.05
Natural Gas $466,178 116,602 MMBtu $4.00
Fuel Oil #6 $225,142 48,549 MMBtu $4.64
TOTAL ENERGY COSTS $1,389,037
RECOMMENDED SAVINGS* $82,117 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $71,361
#|Description Savings
Cost
Status Electricity Usage Natural Gas Fuel Oil #6 Administrative Changes Electricity Usage Natural Gas Fuel Oil #6 Administrative Changes
$ kWh $ MMBtu $ MMBtu $ $
01: 2.2135 REPAIR AND ELIMINATE STEAM LEAKS Savings:
$26,651
Cost:
$490
- - $17,956 4,489 $8,695 1,888 - - -
-
kWh
$17,956
4,489
MMBtu
$8,695
1,888
MMBtu
-
-
$
02: 2.2135 REPAIR AND ELIMINATE STEAM LEAKS Savings:
$20,398
Cost:
$1,400
- - $13,744 3,436 $6,654 1,445 - - -
-
kWh
$13,744
3,436
MMBtu
$6,654
1,445
MMBtu
-
-
$
03: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$9,667
Cost:
$1,955
- - $6,512 1,628 $3,155 685 - - -
-
kWh
$6,512
1,628
MMBtu
$3,155
685
MMBtu
-
-
$
04: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$6,628
Cost:
-
- - $6,928 1,732 - - $(-300) - -
-
kWh
$6,928
1,732
MMBtu
-
-
MMBtu
$(-300)
-
$
05: 2.2511 INSULATE BARE EQUIPMENT Savings:
$4,585
Cost:
$1,288
- - $3,088 772 $1,497 325 - - -
-
kWh
$3,088
772
MMBtu
$1,497
325
MMBtu
-
-
$
06: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$3,677
Cost:
$6,720
- - $2,480 620 $1,197 260 - - -
-
kWh
$2,480
620
MMBtu
$1,197
260
MMBtu
-
-
$
07: 3.4156 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE Savings:
$2,825
Cost:
$1,480
- - $1,904 476 $921 200 - - -
-
kWh
$1,904
476
MMBtu
$921
200
MMBtu
-
-
$
08: 2.2511 INSULATE BARE EQUIPMENT Savings:
$3,692
Cost:
$1,739
$3,692 78,546 - - - - - - $3,692
78,546
kWh
-
-
MMBtu
-
-
MMBtu
-
-
$
09: 2.7133 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE Savings:
$2,479
Cost:
$1,240
$2,479 52,755 - - - - - - $2,479
52,755
kWh
-
-
MMBtu
-
-
MMBtu
-
-
$
10: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,515
Cost:
-
$1,515 32,239 - - - - - - $1,515
32,239
kWh
-
-
MMBtu
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$82,117
Cost:
$16,312
$7,686 163,540 $52,612 13,153 $22,119 4,803 $(-300) - $7,686
163,540
kWh
$52,612
13,153
MMBtu
$22,119
4,803
MMBtu
$(-300)
-
$
TOTAL IMPLEMENTED Savings:
$71,361
Cost:
$12,045
$1,515 32,239 $49,524 12,381 $20,622 4,478 $(-300) - $1,515
32,239
kWh
$49,524
12,381
MMBtu
$20,622
4,478
MMBtu
$(-300)
-
$
Savings