Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Tennessee |
---|---|
Assessment Year | 1988 |
Principal Product | INDUS. & AUTO INSULATION |
NAICS | n/a |
SIC | 3296 - Mineral Wool |
Sales | $10,000,000-$50,000,000 |
# of Employees | 465 |
Plant Area (Sq.Ft.) | 0 |
Annual Production | 26,400,000 Pounds |
Production Hrs. Annual | 8,568 |
Location (State) | KY |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $489,117 | 12,623,974 | kWh | $0.04 |
Natural Gas | $742,825 | 186,851 | MMBtu | $3.98 |
TOTAL ENERGY COSTS | $1,231,942 | |||
RECOMMENDED SAVINGS* | $124,769 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $94,457 |
#|Description |
Savings Cost |
Status | Electricity Usage | Natural Gas | Administrative Changes | Electricity Usage | Natural Gas | Administrative Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7245 USE DIRECT AIR SUPPLY TO EXHAUST HOODS |
Savings: $40,900 Cost: $36,580 |
- | - | $40,900 | 10,225 | - | - |
- - kWh |
$40,900 10,225 MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $30,312 Cost: $4,473 |
- | - | $30,312 | 7,578 | - | - |
- - kWh |
$30,312 7,578 MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS |
Savings: $26,084 Cost: - |
$26,084 | 668,816 | - | - | - | - |
$26,084 668,816 kWh |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO |
Savings: $3,484 Cost: - |
- | - | $4,484 | 1,121 | $(-1,000) | - |
- - kWh |
$4,484 1,121 MMBtu |
$(-1,000) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $8,710 Cost: $210 |
$8,710 | 223,329 | - | - | - | - |
$8,710 223,329 kWh |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.6232 INSTALL SET-BACK TIMERS |
Savings: $2,137 Cost: - |
$2,137 | 54,807 | - | - | - | - |
$2,137 54,807 kWh |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.3212 OPTIMIZE PLANT POWER FACTOR |
Savings: $13,142 Cost: $9,400 |
$13,142 | - | - | - | - | - |
$13,142 - kWh |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $124,769 Cost: $50,663 |
$50,073 | 946,952 | $75,696 | 18,924 | $(-1,000) | - | $50,073 946,952 kWh |
$75,696 18,924 MMBtu |
$(-1,000) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $94,457 Cost: $46,190 |
$50,073 | 946,952 | $45,384 | 11,346 | $(-1,000) | - | $50,073 946,952 kWh |
$45,384 11,346 MMBtu |
$(-1,000) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Natural Gas | Administrative Changes | Electricity Usage | Natural Gas | Administrative Changes |