Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Tennessee |
---|---|
Assessment Year | 1988 |
Principal Product | CARBONATED BEVERAGES |
NAICS | n/a |
SIC | 2086 - Bottled And Canned Soft Drinks |
Sales | $10,000,000-$50,000,000 |
# of Employees | 60 |
Plant Area (Sq.Ft.) | 0 |
Annual Production | 3,000,000 Pieces |
Production Hrs. Annual | 6,240 |
Location (State) | VA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $81,656 | 1,347,304 | kWh | $0.06 |
LPG | $26,139 | 3,683 | MMBtu | $7.10 |
Fuel Oil #6 | $22,051 | 5,323 | MMBtu | $4.14 |
TOTAL ENERGY COSTS | $129,846 | |||
RECOMMENDED SAVINGS* | $25,031 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $6,387 |
#|Description |
Savings Cost |
Status | Electricity Usage | LPG | Fuel Oil #6 | Administrative Changes | Electricity Usage | LPG | Fuel Oil #6 | Administrative Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | $ | MMBtu | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES |
Savings: $14,407 Cost: $2,574 |
- | - | $6,528 | 920 | $7,879 | 1,901 | - | - |
- - kWh |
$6,528 920 MMBtu |
$7,879 1,901 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO |
Savings: $2,720 Cost: - |
- | - | $1,369 | 193 | $1,651 | 399 | $(-300) | - |
- - kWh |
$1,369 193 MMBtu |
$1,651 399 MMBtu |
$(-300) - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $2,896 Cost: $1,110 |
$2,896 | 47,479 | - | - | - | - | - | - |
$2,896 47,479 kWh |
- - MMBtu |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.2135 REPAIR AND ELIMINATE STEAM LEAKS |
Savings: $771 Cost: $225 |
- | - | $348 | 49 | $423 | 102 | - | - |
- - kWh |
$348 49 MMBtu |
$423 102 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS |
Savings: $2,271 Cost: - |
$2,271 | 37,222 | - | - | - | - | - | - |
$2,271 37,222 kWh |
- - MMBtu |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $1,144 Cost: - |
$1,144 | 18,757 | - | - | - | - | - | - |
$1,144 18,757 kWh |
- - MMBtu |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.4312 IMPROVE LUBRICATION PRACTICES |
Savings: $411 Cost: $600 |
$411 | 6,741 | - | - | - | - | - | - |
$411 6,741 kWh |
- - MMBtu |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $411 Cost: $385 |
$411 | 6,741 | - | - | - | - | - | - |
$411 6,741 kWh |
- - MMBtu |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $25,031 Cost: $4,894 |
$7,133 | 116,940 | $8,245 | 1,162 | $9,953 | 2,402 | $(-300) | - | $7,133 116,940 kWh |
$8,245 1,162 MMBtu |
$9,953 2,402 MMBtu |
$(-300) - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $6,387 Cost: $1,335 |
$2,896 | 47,479 | $1,717 | 242 | $2,074 | 501 | $(-300) | - | $2,896 47,479 kWh |
$1,717 242 MMBtu |
$2,074 501 MMBtu |
$(-300) - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | $ | MMBtu | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | LPG | Fuel Oil #6 | Administrative Changes | Electricity Usage | LPG | Fuel Oil #6 | Administrative Changes |