Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Tennessee |
---|---|
Assessment Year | 1990 |
Principal Product | FORKLIFTS |
NAICS | n/a |
SIC | 3537 - Industrial Trucks And Tractors |
Sales | $100,000,000-$500,000,000 |
# of Employees | 320 |
Plant Area (Sq.Ft.) | 0 |
Annual Production | 7,700 Pieces |
Production Hrs. Annual | 6,240 |
Location (State) | KY |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $322,557 | 6,085,580 | kWh | $0.05 |
Natural Gas | $82,190 | 15,653 | MMBtu | $5.25 |
TOTAL ENERGY COSTS | $404,747 | |||
RECOMMENDED SAVINGS* | $21,614 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $18,397 |
#|Description |
Savings Cost |
Status | Electricity Usage | Natural Gas | Administrative Changes | Electricity Usage | Natural Gas | Administrative Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7243 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS |
Savings: $8,045 Cost: $18,750 |
- | - | $8,045 | 1,518 | - | - |
- - kWh |
$8,045 1,518 MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.2153 CLOSE OFF UNNEEDED STEAM LINES |
Savings: $3,217 Cost: - |
- | - | $3,217 | 607 | - | - |
- - kWh |
$3,217 607 MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS |
Savings: $4,349 Cost: - |
$4,349 | 82,063 | - | - | - | - |
$4,349 82,063 kWh |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.2422 USE WASTE HEAT FROM HOT FLUE GASES TO GENERATE STEAM |
Savings: $1,071 Cost: $2,350 |
- | - | $1,071 | 202 | - | - |
- - kWh |
$1,071 202 MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7123 KEEP LAMPS AND REFLECTORS CLEAN |
Savings: $2,447 Cost: $7,125 |
$1,487 | 28,136 | - | - | $960 | - |
$1,487 28,136 kWh |
- - MMBtu |
$960 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $1,258 Cost: $600 |
$1,258 | 23,740 | - | - | - | - |
$1,258 23,740 kWh |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $1,227 Cost: $690 |
$1,227 | 23,154 | - | - | - | - |
$1,227 23,154 kWh |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $21,614 Cost: $29,515 |
$8,321 | 157,093 | $12,333 | 2,327 | $960 | - | $8,321 157,093 kWh |
$12,333 2,327 MMBtu |
$960 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $18,397 Cost: $29,515 |
$8,321 | 157,093 | $9,116 | 1,720 | $960 | - | $8,321 157,093 kWh |
$9,116 1,720 MMBtu |
$960 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Natural Gas | Administrative Changes | Electricity Usage | Natural Gas | Administrative Changes |