IAC Assessment: TN0396
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: TN0396
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Tennessee
Assessment Year 1990
Principal Product DENIM JEANS
NAICS n/a
SIC 2325 - Men's and Boys' Separate Trousers and Slacks
Sales $500,000-$1,000,000
# of Employees 300
Plant Area (Sq.Ft.) 0
Annual Production 145,000 Pieces
Production Hrs. Annual 2,091
Location (State) KY
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $51,642 1,145,076 kWh $0.05
Natural Gas $4,669 849 MMBtu $5.50
TOTAL ENERGY COSTS $56,311
RECOMMENDED SAVINGS* $9,044 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $1,694
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 2.7123 KEEP LAMPS AND REFLECTORS CLEAN Savings:
$5,135
Cost:
$19,742
$4,445 98,769 - - $690 - $4,445
98,769
kWh
-
-
MMBtu
$690
-
$
02: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$770
Cost:
$1,025
- - $770 140 - - -
-
kWh
$770
140
MMBtu
-
-
$
03: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$1,635
Cost:
-
$1,635 36,342 - - - - $1,635
36,342
kWh
-
-
MMBtu
-
-
$
04: 2.6232 INSTALL SET-BACK TIMERS Savings:
$462
Cost:
-
$462 10,258 - - - - $462
10,258
kWh
-
-
MMBtu
-
-
$
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$462
Cost:
$360
$462 10,258 - - - - $462
10,258
kWh
-
-
MMBtu
-
-
$
06: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$290
Cost:
$385
$290 6,448 - - - - $290
6,448
kWh
-
-
MMBtu
-
-
$
07: 2.4312 IMPROVE LUBRICATION PRACTICES Savings:
$290
Cost:
$1,000
$290 6,448 - - - - $290
6,448
kWh
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$9,044
Cost:
$22,512
$7,584 168,523 $770 140 $690 - $7,584
168,523
kWh
$770
140
MMBtu
$690
-
$
TOTAL IMPLEMENTED Savings:
$1,694
Cost:
$1,385
$924 20,516 $770 140 - - $924
20,516
kWh
$770
140
MMBtu
-
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes