IAC logo
IAC Assessment: TN0405
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: TN0405
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Tennessee
Assessment Year 1990
Principal Product CONCRETE BLOCKS
NAICS n/a
SIC 3271 - Concrete Block And Brick
Sales $1,000,000-$5,000,000
# of Employees 15
Plant Area (Sq.Ft.) 0
Annual Production 1,200,000 Pieces
Production Hrs. Annual 1,650
Location (State) VA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $11,741 169,109 kWh $0.07
Fuel Oil #2 $8,822 1,680 MMBtu $5.25
TOTAL ENERGY COSTS $20,563
RECOMMENDED SAVINGS* $3,195 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $1,081
#|Description Savings
Cost
Status Electricity Usage Fuel Oil #2 Administrative Changes Electricity Usage Fuel Oil #2 Administrative Changes
$ kWh $ MMBtu $ $
01: 2.1232 KEEP BOILER TUBES CLEAN Savings:
$779
Cost:
$2,640
- - $879 162 $(-100) - -
-
kWh
$879
162
MMBtu
$(-100)
-
$
02: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$1,970
Cost:
$870
$1,970 28,136 - - - - $1,970
28,136
kWh
-
-
MMBtu
-
-
$
03: 2.2135 REPAIR AND ELIMINATE STEAM LEAKS Savings:
$76
Cost:
$350
- - $76 14 - - -
-
kWh
$76
14
MMBtu
-
-
$
04: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$226
Cost:
-
$226 3,224 - - - - $226
3,224
kWh
-
-
MMBtu
-
-
$
05: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$144
Cost:
-
$144 2,052 - - - - $144
2,052
kWh
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$3,195
Cost:
$3,860
$2,340 33,412 $955 176 $(-100) - $2,340
33,412
kWh
$955
176
MMBtu
$(-100)
-
$
TOTAL IMPLEMENTED Savings:
$1,081
Cost:
$2,990
$226 3,224 $955 176 $(-100) - $226
3,224
kWh
$955
176
MMBtu
$(-100)
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Fuel Oil #2 Administrative Changes Electricity Usage Fuel Oil #2 Administrative Changes