IAC Assessment: TN0416
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: TN0416
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Tennessee
Assessment Year 1990
Principal Product GAS BURNERS & MANIFOLDS
NAICS n/a
SIC 3714 - Motor Vehicle Parts And Accessories
Sales $5,000,000-$10,000,000
# of Employees 145
Plant Area (Sq.Ft.) 0
Annual Production 3,000,000 Pieces
Production Hrs. Annual 5,640
Location (State) TN
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $96,569 1,618,113 kWh $0.06
Natural Gas $15,732 3,851 MMBtu $4.09
TOTAL ENERGY COSTS $112,301
RECOMMENDED SAVINGS* $9,468 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $8,114
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$1,269
Cost:
$3,090
$281 4,689 $988 241 - - $281
4,689
kWh
$988
241
MMBtu
-
-
$
02: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$1,758
Cost:
-
$1,758 29,308 - - - - $1,758
29,308
kWh
-
-
MMBtu
-
-
$
03: 2.2511 INSULATE BARE EQUIPMENT Savings:
$2,145
Cost:
$300
$2,145 35,756 - - - - $2,145
35,756
kWh
-
-
MMBtu
-
-
$
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,811
Cost:
$420
$1,811 30,188 - - - - $1,811
30,188
kWh
-
-
MMBtu
-
-
$
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,354
Cost:
$200
$1,354 22,567 - - - - $1,354
22,567
kWh
-
-
MMBtu
-
-
$
06: 2.7123 KEEP LAMPS AND REFLECTORS CLEAN Savings:
$1,131
Cost:
$3,531
$1,055 17,585 - - $76 - $1,055
17,585
kWh
-
-
MMBtu
$76
-
$
TOTAL RECOMMENDED Savings:
$9,468
Cost:
$7,541
$8,404 140,093 $988 241 $76 - $8,404
140,093
kWh
$988
241
MMBtu
$76
-
$
TOTAL IMPLEMENTED Savings:
$8,114
Cost:
$7,341
$7,050 117,526 $988 241 $76 - $7,050
117,526
kWh
$988
241
MMBtu
$76
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes