Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Tennessee
Assessment Year 1992
Principal Product RAYON AND COATED CLOTH
NAICS n/a
SIC 2823 - Cellulosic Manmade Fibers
Sales $50,000,000-$100,000,000
# of Employees 1,425
Plant Area (Sq.Ft.) 0
Annual Production 24,000,000 Pounds
Production Hrs. Annual 8,736
Location (State) TN
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $51,875 681,125 kWh $0.08
Natural Gas $71,145 12,606 MMBtu $5.64
Coal $4,811,511 4,000,000 MMBtu $1.20
TOTAL ENERGY COSTS $4,934,531
RECOMMENDED SAVINGS* $336,170 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $336,170
#|Description Savings
Cost
Status Electricity Usage Coal Electricity Usage Coal
$ kWh $ MMBtu
01: 2.2113 REPAIR OR REPLACE STEAM TRAPS Savings:
$157,734
Cost:
$15,225
- - $157,734 131,250 -
-
kWh
$157,734
131,250
MMBtu
02: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$94,476
Cost:
$22,010
- - $94,476 78,613 -
-
kWh
$94,476
78,613
MMBtu
03: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$24,383
Cost:
$7,272
- - $24,383 20,289 -
-
kWh
$24,383
20,289
MMBtu
04: 2.2135 REPAIR AND ELIMINATE STEAM LEAKS Savings:
$11,943
Cost:
$2,965
- - $11,943 9,938 -
-
kWh
$11,943
9,938
MMBtu
05: 2.2511 INSULATE BARE EQUIPMENT Savings:
$3,501
Cost:
$2,366
- - $3,501 2,913 -
-
kWh
$3,501
2,913
MMBtu
06: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$2,509
Cost:
$1,410
- - $2,509 2,086 -
-
kWh
$2,509
2,086
MMBtu
07: 2.4312 IMPROVE LUBRICATION PRACTICES Savings:
$1,749
Cost:
-
- - $1,749 1,455 -
-
kWh
$1,749
1,455
MMBtu
08: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$39,875
Cost:
$44,300
$39,875 - - - $39,875
-
kWh
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$336,170
Cost:
$95,548
$39,875 - $296,295 246,544 $39,875
-
kWh
$296,295
246,544
MMBtu
TOTAL IMPLEMENTED Savings:
$336,170
Cost:
$95,548
$39,875 - $296,295 246,544 $39,875
-
kWh
$296,295
246,544
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Coal Electricity Usage Coal