Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Tennessee |
---|---|
Assessment Year | 1992 |
Principal Product | RAYON AND COATED CLOTH |
NAICS | n/a |
SIC | 2823 - Cellulosic Manmade Fibers |
Sales | $50,000,000-$100,000,000 |
# of Employees | 1,425 |
Plant Area (Sq.Ft.) | 0 |
Annual Production | 24,000,000 Pounds |
Production Hrs. Annual | 8,736 |
Location (State) | TN |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $51,875 | 681,125 | kWh | $0.08 |
Natural Gas | $71,145 | 12,606 | MMBtu | $5.64 |
Coal | $4,811,511 | 4,000,000 | MMBtu | $1.20 |
TOTAL ENERGY COSTS | $4,934,531 | |||
RECOMMENDED SAVINGS* | $336,170 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $336,170 |
#|Description |
Savings Cost |
Status | Electricity Usage | Coal | Electricity Usage | Coal | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.2113 REPAIR OR REPLACE STEAM TRAPS |
Savings: $157,734 Cost: $15,225 |
- | - | $157,734 | 131,250 |
- - kWh |
$157,734 131,250 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES |
Savings: $94,476 Cost: $22,010 |
- | - | $94,476 | 78,613 |
- - kWh |
$94,476 78,613 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS |
Savings: $24,383 Cost: $7,272 |
- | - | $24,383 | 20,289 |
- - kWh |
$24,383 20,289 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.2135 REPAIR AND ELIMINATE STEAM LEAKS |
Savings: $11,943 Cost: $2,965 |
- | - | $11,943 | 9,938 |
- - kWh |
$11,943 9,938 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $3,501 Cost: $2,366 |
- | - | $3,501 | 2,913 |
- - kWh |
$3,501 2,913 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $2,509 Cost: $1,410 |
- | - | $2,509 | 2,086 |
- - kWh |
$2,509 2,086 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.4312 IMPROVE LUBRICATION PRACTICES |
Savings: $1,749 Cost: - |
- | - | $1,749 | 1,455 |
- - kWh |
$1,749 1,455 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE |
Savings: $39,875 Cost: $44,300 |
$39,875 | - | - | - |
$39,875 - kWh |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $336,170 Cost: $95,548 |
$39,875 | - | $296,295 | 246,544 | $39,875 - kWh |
$296,295 246,544 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $336,170 Cost: $95,548 |
$39,875 | - | $296,295 | 246,544 | $39,875 - kWh |
$296,295 246,544 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Coal | Electricity Usage | Coal |