IAC logo
IAC Assessment: TN0491
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: TN0491
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Tennessee
Assessment Year 1993
Principal Product Metallic wind tunnel test models
NAICS n/a
SIC 3462 - Iron And Steel Forgings
Sales $10,000,000-$50,000,000
# of Employees 130
Plant Area (Sq.Ft.) 55,000
Annual Production 50 Pieces
Production Hrs. Annual 6,000
Location (State) TN
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $98,298 2,006,155 kWh $0.05
Natural Gas $1,231 111 MMBtu $11.09
TOTAL ENERGY COSTS $99,529
RECOMMENDED SAVINGS* $8,236 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $3,305
#|Description Savings
Cost
Status Electricity Usage Electricity Usage
$ kWh
01: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$4,084
Cost:
$3,680
$4,084 80,598 $4,084
80,598
kWh
02: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$1,810
Cost:
$2,260
$1,810 36,928 $1,810
36,928
kWh
03: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$991
Cost:
$320
$991 20,223 $991
20,223
kWh
04: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$488
Cost:
-
$488 9,965 $488
9,965
kWh
05: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$504
Cost:
$320
$504 9,672 $504
9,672
kWh
06: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$201
Cost:
$560
$201 4,103 $201
4,103
kWh
07: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$158
Cost:
$520
$158 3,224 $158
3,224
kWh
TOTAL RECOMMENDED Savings:
$8,236
Cost:
$7,660
$8,236 164,713 $8,236
164,713
kWh
TOTAL IMPLEMENTED Savings:
$3,305
Cost:
$2,900
$3,305 66,823 $3,305
66,823
kWh
Savings
Cost
$ kWh
Electricity Usage Electricity Usage