IAC Assessment: TN0513
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: TN0513
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Tennessee
Assessment Year 1994
Principal Product Electric relays and solenoids
NAICS n/a
SIC 3625 - Relays And Industrial Controls
Sales $10,000,000-$50,000,000
# of Employees 300
Plant Area (Sq.Ft.) 65,000
Annual Production 1,000,000 Pieces
Production Hrs. Annual 3,875
Location (State) NC
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $130,531 2,050,117 kWh $0.06
Fuel Oil #2 $7,065 1,939 MMBtu $3.64
TOTAL ENERGY COSTS $137,596
RECOMMENDED SAVINGS* $18,195 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $2,497
#|Description Savings
Cost
Status Electricity Usage Fuel Oil #2 Electricity Usage Fuel Oil #2
$ kWh $ MMBtu
01: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$7,632
Cost:
$3,500
$6,321 98,769 $1,311 360 $6,321
98,769
kWh
$1,311
360
MMBtu
02: 2.2153 CLOSE OFF UNNEEDED STEAM LINES Savings:
$1,428
Cost:
-
- - $1,428 392 -
-
kWh
$1,428
392
MMBtu
03: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$3,733
Cost:
-
$3,733 58,324 - - $3,733
58,324
kWh
-
-
MMBtu
04: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$3,076
Cost:
$3,350
$3,076 48,066 - - $3,076
48,066
kWh
-
-
MMBtu
05: 2.2511 INSULATE BARE EQUIPMENT Savings:
$168
Cost:
$95
- - $168 46 -
-
kWh
$168
46
MMBtu
06: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$638
Cost:
$480
$638 9,965 - - $638
9,965
kWh
-
-
MMBtu
07: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$431
Cost:
$1,300
$431 6,741 - - $431
6,741
kWh
-
-
MMBtu
08: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$338
Cost:
$570
$338 5,275 - - $338
5,275
kWh
-
-
MMBtu
09: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$319
Cost:
$120
$319 4,982 - - $319
4,982
kWh
-
-
MMBtu
10: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$263
Cost:
-
$263 4,103 - - $263
4,103
kWh
-
-
MMBtu
11: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$169
Cost:
$470
$169 2,638 - - $169
2,638
kWh
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$18,195
Cost:
$9,885
$15,288 238,863 $2,907 798 $15,288
238,863
kWh
$2,907
798
MMBtu
TOTAL IMPLEMENTED Savings:
$2,497
Cost:
$575
$901 14,068 $1,596 438 $901
14,068
kWh
$1,596
438
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Fuel Oil #2 Electricity Usage Fuel Oil #2