IAC Assessment: TN0538
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: TN0538
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Tennessee
Assessment Year 1995
Principal Product Aircraft and missile components
NAICS n/a
SIC 3463 - Nonferrous Forgings
Sales $5,000,000-$10,000,000
# of Employees 100
Plant Area (Sq.Ft.) 150,000
Annual Production 11,000 Tons
Production Hrs. Annual 4,160
Location (State) TN
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $143,371 2,109,613 kWh $0.07
Natural Gas $33,121 3,812 MMBtu $8.69
TOTAL ENERGY COSTS $176,492
RECOMMENDED SAVINGS* $12,046 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $9,208
#|Description Savings
Cost
Status Electricity Usage Electricity Usage
$ kWh
01: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$3,201
Cost:
-
$3,201 56,272 $3,201
56,272
kWh
02: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$2,149
Cost:
-
$2,149 21,981 $2,149
21,981
kWh
03: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$1,115
Cost:
$253
$1,115 8,792 $1,115
8,792
kWh
04: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$471
Cost:
$810
$471 7,913 $471
7,913
kWh
05: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED Savings:
$218
Cost:
$435
$218 7,034 $218
7,034
kWh
06: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$4,892
Cost:
$5,000
$4,892 - $4,892
-
kWh
TOTAL RECOMMENDED Savings:
$12,046
Cost:
$6,498
$12,046 101,992 $12,046
101,992
kWh
TOTAL IMPLEMENTED Savings:
$9,208
Cost:
$5,253
$9,208 65,064 $9,208
65,064
kWh
Savings
Cost
$ kWh
Electricity Usage Electricity Usage