IAC logo
IAC Assessment: TN0559
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: TN0559
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Tennessee
Assessment Year 1995
Principal Product small electric motors
NAICS n/a
SIC 3316 - Cold Finishing Of Steel Shapes
Sales $50,000,000-$100,000,000
# of Employees 474
Plant Area (Sq.Ft.) 226,000
Annual Production 12,000,000 Pieces
Production Hrs. Annual 4,165
Location (State) TN
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $983,163 22,361,372 kWh $0.04
Natural Gas $122,028 38,036 MMBtu $3.21
TOTAL ENERGY COSTS $2,568,849
RECOMMENDED SAVINGS* $455,954 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $242,207
#|Description Savings
Cost
Status Electricity Usage Natural Gas Other Liquid (non-haz) Solid Waste (non-haz) Electricity Usage Natural Gas Other Liquid (non-haz) Solid Waste (non-haz)
$ kWh $ MMBtu $ gal $ lb
01: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$9,785
Cost:
$5,640
$3,871 148,886 $5,914 1,848 - - - - $3,871
148,886
kWh
$5,914
1,848
MMBtu
-
-
gal
-
-
lb
02: 2.7243 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS Savings:
$3,680
Cost:
$12,800
- - $3,680 1,150 - - - - -
-
kWh
$3,680
1,150
MMBtu
-
-
gal
-
-
lb
03: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$2,531
Cost:
$3,600
- - $2,531 791 - - - - -
-
kWh
$2,531
791
MMBtu
-
-
gal
-
-
lb
04: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$4,207
Cost:
$990
$4,207 75,029 - - - - - - $4,207
75,029
kWh
-
-
MMBtu
-
-
gal
-
-
lb
05: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$17,212
Cost:
$6,100
$20,175 211,606 $(-2,963) (-926) - - - - $20,175
211,606
kWh
$(-2,963)
(-926)
MMBtu
-
-
gal
-
-
lb
06: 3.5248 SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY OR FOR SALE Savings:
$238,000
Cost:
$2,250
- - - - - - $238,000 - -
-
kWh
-
-
MMBtu
-
-
gal
$238,000
-
lb
07: 3.5146 UTILIZE A CENTRAL COOLANT SYSTEM FOR CLEANING AND REUSE OF METAL WORKING FLUID Savings:
$119,243
Cost:
$20,200
- - - - $119,243 155,591 - - -
-
kWh
-
-
MMBtu
$119,243
155,591
gal
-
-
lb
08: 3.3131 USE EVAPORATION TO CONCENTRATE MATERIAL Savings:
$61,296
Cost:
$75,000
- - - - $61,296 1,120,000 - - -
-
kWh
-
-
MMBtu
$61,296
1,120,000
gal
-
-
lb
TOTAL RECOMMENDED Savings:
$455,954
Cost:
$126,580
$28,253 435,521 $9,162 2,863 $180,539 1,275,591 $238,000 - $28,253
435,521
kWh
$9,162
2,863
MMBtu
$180,539
1,275,591
gal
$238,000
-
lb
TOTAL IMPLEMENTED Savings:
$242,207
Cost:
$3,240
$4,207 75,029 - - - - $238,000 - $4,207
75,029
kWh
-
-
MMBtu
-
-
gal
$238,000
-
lb
Savings
Cost
$ kWh $ MMBtu $ gal $ lb
Electricity Usage Natural Gas Other Liquid (non-haz) Solid Waste (non-haz) Electricity Usage Natural Gas Other Liquid (non-haz) Solid Waste (non-haz)