IAC logo
IAC Assessment: TN0567
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: TN0567
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Tennessee
Assessment Year 1996
Principal Product Alcoholic beverages
NAICS n/a
SIC 2085 - Distilled And Blended Liquors
Sales >$500,000,000
# of Employees 100
Plant Area (Sq.Ft.) 500,000
Annual Production 13,000 Thousand Gallons
Production Hrs. Annual 6,048
Location (State) TN
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $870,433 21,486,518 kWh $0.04
Electricity Demand $289,561 42,186 kW-months/year $6.86
Natural Gas $57,028 19,037 MMBtu $3.00
Wood $121,750 900,000 MMBtu $0.14
TOTAL ENERGY COSTS $1,467,522
RECOMMENDED SAVINGS* $4,295,710 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Wood Gaseous Waste Personnel Changes Ancillary Material Cost By-product Production Electricity Usage Electricity Demand Natural Gas Wood Gaseous Waste Personnel Changes Ancillary Material Cost By-product Production
$ kWh $ kW-months/year $ MMBtu $ MMBtu $ lb $ $ $ $ $ $
01: 3.1182 MAKE A NEW BY-PRODUCT Savings:
$3,153,280
Cost:
$5,059,000
$(-2,000,000) (-76,923,213) - - - - - - $8,000,000 40,000,000 $(-846,720) - $(-2,000,000) - - - $(-2,000,000)
(-76,923,213)
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
$8,000,000
40,000,000
lb
$(-846,720)
-
$
$(-2,000,000)
-
$
-
-
$
02: 2.3412 USE WASTE HEAT TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR Savings:
$772,731
Cost:
$2,866,500
$870,433 21,486,518 - - $(-29,180) (-9,699) $(-68,522) (-508,086) - - - - - - - - $870,433
21,486,518
kWh
-
-
kW-months/year
$(-29,180)
(-9,699)
MMBtu
$(-68,522)
(-508,086)
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
$
03: 3.1182 MAKE A NEW BY-PRODUCT Savings:
$329,700
Cost:
$7,300
- - - - - - - - - - $(-37,800) - $(-30,000) - $397,500 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
lb
$(-37,800)
-
$
$(-30,000)
-
$
$397,500
-
$
04: 2.2514 COVER OPEN TANKS Savings:
$19,440
Cost:
$25,100
- - - - - - $19,440 144,000 - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$19,440
144,000
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
$
05: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$10,799
Cost:
$27,000
- - $10,799 - - - - - - - - - - - - - -
-
kWh
$10,799
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
$
06: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$9,760
Cost:
$3,885
$4,991 191,970 $4,769 468 - - - - - - - - - - - - $4,991
191,970
kWh
$4,769
468
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$4,295,710
Cost:
$7,988,785
$(-1,124,576) (-55,244,725) $15,568 468 $(-29,180) (-9,699) $(-49,082) (-364,086) $8,000,000 40,000,000 $(-884,520) - $(-2,030,000) - $397,500 - $(-1,124,576)
(-55,244,725)
kWh
$15,568
468
kW-months/year
$(-29,180)
(-9,699)
MMBtu
$(-49,082)
(-364,086)
MMBtu
$8,000,000
40,000,000
lb
$(-884,520)
-
$
$(-2,030,000)
-
$
$397,500
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ MMBtu $ lb $ $ $ $ $ $
Electricity Usage Electricity Demand Natural Gas Wood Gaseous Waste Personnel Changes Ancillary Material Cost By-product Production Electricity Usage Electricity Demand Natural Gas Wood Gaseous Waste Personnel Changes Ancillary Material Cost By-product Production