IAC logo
IAC Assessment: TN0581
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: TN0581
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Tennessee
Assessment Year 1996
Principal Product Plastics Additives and Specialty Chemicals
NAICS n/a
SIC 2869 - Industrial Organic Chemicals, Nec
Sales $10,000,000-$50,000,000
# of Employees 39
Plant Area (Sq.Ft.) 39,600
Annual Production 12,000,000 Pounds
Production Hrs. Annual 8,736
Location (State) SC
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $258,725 6,468,054 kWh $0.04
Other Energy $188,644 39,956 MMBtu $4.72
TOTAL ENERGY COSTS $447,369
RECOMMENDED SAVINGS* $54,470 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $455
#|Description Savings
Cost
Status Electricity Usage Other Energy Primary Raw Material Ancillary Material Cost Electricity Usage Other Energy Primary Raw Material Ancillary Material Cost
$ kWh $ MMBtu $ $ $ $
01: 3.5311 RECOVER AND REUSE WASTE MATERIAL Savings:
$25,995
Cost:
$6,250
- - - - $25,995 - - - -
-
kWh
-
-
MMBtu
$25,995
-
$
-
-
$
02: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$20,270
Cost:
$23,940
$20,270 506,741 - - - - - - $20,270
506,741
kWh
-
-
MMBtu
-
-
$
-
-
$
03: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$2,790
Cost:
$1,000
$2,790 69,754 - - - - - - $2,790
69,754
kWh
-
-
MMBtu
-
-
$
-
-
$
04: 2.2163 USE MINIMUM STEAM OPERATING PRESSURE Savings:
$2,360
Cost:
$2,600
- - $2,360 500 - - - - -
-
kWh
$2,360
500
MMBtu
-
-
$
-
-
$
05: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$2,600
Cost:
-
$2,600 65,064 - - - - - - $2,600
65,064
kWh
-
-
MMBtu
-
-
$
-
-
$
06: 2.7124 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED Savings:
$455
Cost:
-
$430 10,844 - - - - $25 - $430
10,844
kWh
-
-
MMBtu
-
-
$
$25
-
$
TOTAL RECOMMENDED Savings:
$54,470
Cost:
$33,790
$26,090 652,403 $2,360 500 $25,995 - $25 - $26,090
652,403
kWh
$2,360
500
MMBtu
$25,995
-
$
$25
-
$
TOTAL IMPLEMENTED Savings:
$455
Cost:
-
$430 10,844 - - - - $25 - $430
10,844
kWh
-
-
MMBtu
-
-
$
$25
-
$
Savings
Cost
$ kWh $ MMBtu $ $ $ $
Electricity Usage Other Energy Primary Raw Material Ancillary Material Cost Electricity Usage Other Energy Primary Raw Material Ancillary Material Cost