Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Tennessee |
---|---|
Assessment Year | 1996 |
Principal Product | Plastics Additives and Specialty Chemicals |
NAICS | n/a |
SIC | 2869 - Industrial Organic Chemicals, Nec |
Sales | $10,000,000-$50,000,000 |
# of Employees | 39 |
Plant Area (Sq.Ft.) | 39,600 |
Annual Production | 12,000,000 Pounds |
Production Hrs. Annual | 8,736 |
Location (State) | SC |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $258,725 | 6,468,054 | kWh | $0.04 |
Other Energy | $188,644 | 39,956 | MMBtu | $4.72 |
TOTAL ENERGY COSTS | $447,369 | |||
RECOMMENDED SAVINGS* | $54,470 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $455 |
#|Description |
Savings Cost |
Status | Electricity Usage | Other Energy | Primary Raw Material | Ancillary Material Cost | Electricity Usage | Other Energy | Primary Raw Material | Ancillary Material Cost | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 3.5311 RECOVER AND REUSE WASTE MATERIAL |
Savings: $25,995 Cost: $6,250 |
- | - | - | - | $25,995 | - | - | - |
- - kWh |
- - MMBtu |
$25,995 - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $20,270 Cost: $23,940 |
$20,270 | 506,741 | - | - | - | - | - | - |
$20,270 506,741 kWh |
- - MMBtu |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS |
Savings: $2,790 Cost: $1,000 |
$2,790 | 69,754 | - | - | - | - | - | - |
$2,790 69,754 kWh |
- - MMBtu |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.2163 USE MINIMUM STEAM OPERATING PRESSURE |
Savings: $2,360 Cost: $2,600 |
- | - | $2,360 | 500 | - | - | - | - |
- - kWh |
$2,360 500 MMBtu |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $2,600 Cost: - |
$2,600 | 65,064 | - | - | - | - | - | - |
$2,600 65,064 kWh |
- - MMBtu |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.7124 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED |
Savings: $455 Cost: - |
$430 | 10,844 | - | - | - | - | $25 | - |
$430 10,844 kWh |
- - MMBtu |
- - $ |
$25 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $54,470 Cost: $33,790 |
$26,090 | 652,403 | $2,360 | 500 | $25,995 | - | $25 | - | $26,090 652,403 kWh |
$2,360 500 MMBtu |
$25,995 - $ |
$25 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $455 Cost: - |
$430 | 10,844 | - | - | - | - | $25 | - | $430 10,844 kWh |
- - MMBtu |
- - $ |
$25 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Other Energy | Primary Raw Material | Ancillary Material Cost | Electricity Usage | Other Energy | Primary Raw Material | Ancillary Material Cost |