Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Tennessee |
---|---|
Assessment Year | 1996 |
Principal Product | Analytical instruments |
NAICS | n/a |
SIC | 3823 - Process Control Instruments |
Sales | $10,000,000-$50,000,000 |
# of Employees | 290 |
Plant Area (Sq.Ft.) | 160,000 |
Annual Production | 10,000 Pieces |
Production Hrs. Annual | 4,030 |
Location (State) | TN |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $311,925 | 9,278,429 | kWh | $0.03 |
Natural Gas | $32,692 | 8,457 | MMBtu | $3.87 |
TOTAL ENERGY COSTS | $355,049 | |||
RECOMMENDED SAVINGS* | $62,897 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $47,242 |
#|Description |
Savings Cost |
Status | Electricity Usage | Natural Gas | Other Liquid (haz) | Personnel Changes | Ancillary Material Cost | Electricity Usage | Natural Gas | Other Liquid (haz) | Personnel Changes | Ancillary Material Cost | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | $ | gal | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 3.8142 DISTILL CONTAMINATED SOLVENTS FOR REUSE |
Savings: $45,192 Cost: $51,320 |
- | - | - | - | $42,665 | 4,621 | $2,527 | - | - | - |
- - kWh |
- - MMBtu |
$42,665 4,621 gal |
$2,527 - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7273 INSTALL DESICCANT HUMIDITY CONTROL SYSTEM |
Savings: $14,500 Cost: $13,000 |
- | - | $14,500 | 2,500 | - | - | - | - | - | - |
- - kWh |
$14,500 2,500 MMBtu |
- - gal |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $1,760 Cost: $5,300 |
$1,760 | 56,858 | - | - | - | - | - | - | - | - |
$1,760 56,858 kWh |
- - MMBtu |
- - gal |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7233 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT |
Savings: $610 Cost: $1,800 |
$610 | 19,637 | - | - | - | - | - | - | - | - |
$610 19,637 kWh |
- - MMBtu |
- - gal |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7124 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED |
Savings: $545 Cost: - |
$450 | 14,654 | - | - | - | - | - | - | $95 | - |
$450 14,654 kWh |
- - MMBtu |
- - gal |
- - $ |
$95 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $290 Cost: $845 |
$290 | 9,379 | - | - | - | - | - | - | - | - |
$290 9,379 kWh |
- - MMBtu |
- - gal |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $62,897 Cost: $72,265 |
$3,110 | 100,528 | $14,500 | 2,500 | $42,665 | 4,621 | $2,527 | - | $95 | - | $3,110 100,528 kWh |
$14,500 2,500 MMBtu |
$42,665 4,621 gal |
$2,527 - $ |
$95 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $47,242 Cost: $57,465 |
$2,050 | 66,237 | - | - | $42,665 | 4,621 | $2,527 | - | - | - | $2,050 66,237 kWh |
- - MMBtu |
$42,665 4,621 gal |
$2,527 - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | $ | gal | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Natural Gas | Other Liquid (haz) | Personnel Changes | Ancillary Material Cost | Electricity Usage | Natural Gas | Other Liquid (haz) | Personnel Changes | Ancillary Material Cost |