IAC logo
IAC Assessment: TN0588
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: TN0588
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Tennessee
Assessment Year 1996
Principal Product Analytical instruments
NAICS n/a
SIC 3823 - Process Control Instruments
Sales $10,000,000-$50,000,000
# of Employees 290
Plant Area (Sq.Ft.) 160,000
Annual Production 10,000 Pieces
Production Hrs. Annual 4,030
Location (State) TN
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $311,925 9,278,429 kWh $0.03
Natural Gas $32,692 8,457 MMBtu $3.87
TOTAL ENERGY COSTS $355,049
RECOMMENDED SAVINGS* $62,897 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $47,242
#|Description Savings
Cost
Status Electricity Usage Natural Gas Other Liquid (haz) Personnel Changes Ancillary Material Cost Electricity Usage Natural Gas Other Liquid (haz) Personnel Changes Ancillary Material Cost
$ kWh $ MMBtu $ gal $ $ $ $
01: 3.8142 DISTILL CONTAMINATED SOLVENTS FOR REUSE Savings:
$45,192
Cost:
$51,320
- - - - $42,665 4,621 $2,527 - - - -
-
kWh
-
-
MMBtu
$42,665
4,621
gal
$2,527
-
$
-
-
$
02: 2.7273 INSTALL DESICCANT HUMIDITY CONTROL SYSTEM Savings:
$14,500
Cost:
$13,000
- - $14,500 2,500 - - - - - - -
-
kWh
$14,500
2,500
MMBtu
-
-
gal
-
-
$
-
-
$
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$1,760
Cost:
$5,300
$1,760 56,858 - - - - - - - - $1,760
56,858
kWh
-
-
MMBtu
-
-
gal
-
-
$
-
-
$
04: 2.7233 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT Savings:
$610
Cost:
$1,800
$610 19,637 - - - - - - - - $610
19,637
kWh
-
-
MMBtu
-
-
gal
-
-
$
-
-
$
05: 2.7124 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED Savings:
$545
Cost:
-
$450 14,654 - - - - - - $95 - $450
14,654
kWh
-
-
MMBtu
-
-
gal
-
-
$
$95
-
$
06: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$290
Cost:
$845
$290 9,379 - - - - - - - - $290
9,379
kWh
-
-
MMBtu
-
-
gal
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$62,897
Cost:
$72,265
$3,110 100,528 $14,500 2,500 $42,665 4,621 $2,527 - $95 - $3,110
100,528
kWh
$14,500
2,500
MMBtu
$42,665
4,621
gal
$2,527
-
$
$95
-
$
TOTAL IMPLEMENTED Savings:
$47,242
Cost:
$57,465
$2,050 66,237 - - $42,665 4,621 $2,527 - - - $2,050
66,237
kWh
-
-
MMBtu
$42,665
4,621
gal
$2,527
-
$
-
-
$
Savings
Cost
$ kWh $ MMBtu $ gal $ $ $ $
Electricity Usage Natural Gas Other Liquid (haz) Personnel Changes Ancillary Material Cost Electricity Usage Natural Gas Other Liquid (haz) Personnel Changes Ancillary Material Cost