IAC Assessment: TN0590
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: TN0590
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Tennessee
Assessment Year 1996
Principal Product Motor actuators and thermal controls
NAICS n/a
SIC 3679 - Electronic Components, Nec
Sales $50,000,000-$100,000,000
# of Employees 290
Plant Area (Sq.Ft.) 93,000
Annual Production 9,000,000 Pieces
Production Hrs. Annual 5,400
Location (State) TN
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $145,654 5,611,372 kWh $0.03
Electricity Demand $62,499 12,068 kW-months/year $5.18
Natural Gas $9,786 1,928 MMBtu $5.08
TOTAL ENERGY COSTS $218,364
RECOMMENDED SAVINGS* $168,886 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $167,561
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Ancillary Material Cost By-product Production Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Ancillary Material Cost By-product Production
$ kWh $ kW-months/year $ MMBtu $ lb $ $ $ $ $ $
01: 3.1163 USE PLASTIC PALLETS INSTEAD OF WOOD Savings:
$162,200
Cost:
$297,300
- - - - - - - - - - $162,200 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
$162,200
-
$
-
-
$
02: 3.5316 CONTRACT A WOOD PALLET RECYCLING COMPANY Savings:
$2,400
Cost:
-
- - - - - - - - - - $2,400 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
$2,400
-
$
-
-
$
03: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$2,321
Cost:
$8,150
- - - - $2,321 455 - - - - - - - - -
-
kWh
-
-
kW-months/year
$2,321
455
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
$
04: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$1,325
Cost:
$260
$703 31,946 $622 120 - - - - - - - - - - $703
31,946
kWh
$622
120
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
$
05: 3.5313 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE Savings:
$640
Cost:
$1,120
$(-500) (-22,274) - - - - $250 14,600 $(-750) - - - $1,640 - $(-500)
(-22,274)
kWh
-
-
kW-months/year
-
-
MMBtu
$250
14,600
lb
$(-750)
-
$
-
-
$
$1,640
-
$
TOTAL RECOMMENDED Savings:
$168,886
Cost:
$306,830
$203 9,672 $622 120 $2,321 455 $250 14,600 $(-750) - $164,600 - $1,640 - $203
9,672
kWh
$622
120
kW-months/year
$2,321
455
MMBtu
$250
14,600
lb
$(-750)
-
$
$164,600
-
$
$1,640
-
$
TOTAL IMPLEMENTED Savings:
$167,561
Cost:
$306,570
$(-500) (-22,274) - - $2,321 455 $250 14,600 $(-750) - $164,600 - $1,640 - $(-500)
(-22,274)
kWh
-
-
kW-months/year
$2,321
455
MMBtu
$250
14,600
lb
$(-750)
-
$
$164,600
-
$
$1,640
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ lb $ $ $ $ $ $
Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Ancillary Material Cost By-product Production Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Ancillary Material Cost By-product Production