IAC Assessment: TN0602
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Tennessee
Assessment Year 1997
Principal Product Automotive exhuast components
NAICS n/a
SIC 3714 - Motor Vehicle Parts And Accessories
Sales $100,000,000-$500,000,000
# of Employees 880
Plant Area (Sq.Ft.) 625,000
Annual Production 10,000,000 Pieces
Production Hrs. Annual 6,600
Location (State) TN
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $750,057 23,873,388 kWh $0.03
Electricity Demand $512,783 49,904 kW-months/year $10.28
Electricity Fees $19,146 - $ -
Natural Gas $394,987 55,804 MMBtu $7.08
TOTAL ENERGY COSTS $10,572,923
RECOMMENDED SAVINGS* $881,900 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $881,900
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Primary Raw Material Ancillary Material Cost Primary Product Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Primary Raw Material Ancillary Material Cost Primary Product
$ kWh $ kW-months/year $ MMBtu $ lb $ $ $ $ $ $ $ $
01: 4.6110 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE Savings:
$333,410
Cost:
-
- - - - - - - - $(-76,700) - $2,110 - $(-8,500) - $416,500 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
$(-76,700)
-
$
$2,110
-
$
$(-8,500)
-
$
$416,500
-
$
02: 4.1220 DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS Savings:
$327,397
Cost:
-
- - - - - - $(-14,618) 342,050 - - $102,615 - - - $239,400 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$(-14,618)
342,050
lb
-
-
$
$102,615
-
$
-
-
$
$239,400
-
$
03: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$83,573
Cost:
$108,500
$83,573 2,611,665 - - - - - - - - - - - - - - $83,573
2,611,665
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
$
-
-
$
04: 2.7231 USE RADIANT HEATER FOR SPOT HEATING Savings:
$96,084
Cost:
$35,020
- - - - $96,084 13,533 - - - - - - - - - - -
-
kWh
-
-
kW-months/year
$96,084
13,533
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
$
-
-
$
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$16,339
Cost:
$3,000
$9,979 311,841 $6,360 600 - - - - - - - - - - - - $9,979
311,841
kWh
$6,360
600
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
$
-
-
$
06: 2.7131 ADD AREA LIGHTING SWITCHES Savings:
$11,208
Cost:
$13,340
$11,208 350,234 - - - - - - - - - - - - - - $11,208
350,234
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
$
-
-
$
07: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$10,349
Cost:
$2,016
$6,508 203,400 - - $3,841 541 - - - - - - - - - - $6,508
203,400
kWh
-
-
kW-months/year
$3,841
541
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
$
-
-
$
08: 3.5217 REUSE / RECYCLE/ SELL PAPER PRODUCTS Savings:
$3,540
Cost:
$8,288
$(-20) (-586) - - - - $8,625 375,000 $(-4,125) - - - $(-940) - - - $(-20)
(-586)
kWh
-
-
kW-months/year
-
-
MMBtu
$8,625
375,000
lb
$(-4,125)
-
$
-
-
$
$(-940)
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$881,900
Cost:
$170,164
$111,248 3,476,554 $6,360 600 $99,925 14,074 $(-5,993) 717,050 $(-80,825) - $104,725 - $(-9,440) - $655,900 - $111,248
3,476,554
kWh
$6,360
600
kW-months/year
$99,925
14,074
MMBtu
$(-5,993)
717,050
lb
$(-80,825)
-
$
$104,725
-
$
$(-9,440)
-
$
$655,900
-
$
TOTAL IMPLEMENTED Savings:
$881,900
Cost:
$170,164
$111,248 3,476,554 $6,360 600 $99,925 14,074 $(-5,993) 717,050 $(-80,825) - $104,725 - $(-9,440) - $655,900 - $111,248
3,476,554
kWh
$6,360
600
kW-months/year
$99,925
14,074
MMBtu
$(-5,993)
717,050
lb
$(-80,825)
-
$
$104,725
-
$
$(-9,440)
-
$
$655,900
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ lb $ $ $ $ $ $ $ $
Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Primary Raw Material Ancillary Material Cost Primary Product Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Primary Raw Material Ancillary Material Cost Primary Product