IAC logo
IAC Assessment: TN0604
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: TN0604
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Tennessee
Assessment Year 1997
Principal Product Ready-mix concrete plants
NAICS n/a
SIC 3564 - Blowers And Fans
Sales $10,000,000-$50,000,000
# of Employees 95
Plant Area (Sq.Ft.) 106,000
Annual Production 50 Pieces
Production Hrs. Annual 3,025
Location (State) KY
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $35,347 837,339 kWh $0.04
Electricity Demand $18,627 2,930 kW-months/year $6.36
Electricity Fees $6,245 - $ -
Natural Gas $20,305 4,429 MMBtu $4.58
Other Energy $850 134 MMBtu $6.34
TOTAL ENERGY COSTS $103,424
RECOMMENDED SAVINGS* $92,293 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $65,312
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Other Energy Solid Waste (non-haz) Personnel Changes Administrative Changes Primary Product Electricity Usage Electricity Demand Natural Gas Other Energy Solid Waste (non-haz) Personnel Changes Administrative Changes Primary Product
$ kWh $ kW-months/year $ MMBtu $ MMBtu $ lb $ $ $ $ $ $
01: 3.5248 SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY OR FOR SALE Savings:
$36,000
Cost:
-
- - - - - - - - - - - - $36,000 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
lb
-
-
$
$36,000
-
$
-
-
$
02: 4.1110 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK Savings:
$28,880
Cost:
$7,540
- - - - - - - - - - $28,880 - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
lb
$28,880
-
$
-
-
$
-
-
$
03: 2.7231 USE RADIANT HEATER FOR SPOT HEATING Savings:
$16,711
Cost:
$30,300
- - - - $15,861 3,448 $850 134 - - - - - - - - -
-
kWh
-
-
kW-months/year
$15,861
3,448
MMBtu
$850
134
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
$
04: 4.4210 MODIFY CURRENT INCENTIVE PROGRAM Savings:
$6,500
Cost:
$10,000
- - - - - - - - - - - - - - $6,500 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
$6,500
-
$
05: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS Savings:
$3,770
Cost:
$10,800
- - - - - - - - $3,770 - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
$3,770
-
lb
-
-
$
-
-
$
-
-
$
06: 2.4314 USE SYNTHETIC LUBRICANT Savings:
$432
Cost:
-
$111 3,810 $321 34 - - - - - - - - - - - - $111
3,810
kWh
$321
34
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$92,293
Cost:
$58,640
$111 3,810 $321 34 $15,861 3,448 $850 134 $3,770 - $28,880 - $36,000 - $6,500 - $111
3,810
kWh
$321
34
kW-months/year
$15,861
3,448
MMBtu
$850
134
MMBtu
$3,770
-
lb
$28,880
-
$
$36,000
-
$
$6,500
-
$
TOTAL IMPLEMENTED Savings:
$65,312
Cost:
$7,540
$111 3,810 $321 34 - - - - - - $28,880 - $36,000 - - - $111
3,810
kWh
$321
34
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
lb
$28,880
-
$
$36,000
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ MMBtu $ lb $ $ $ $ $ $
Electricity Usage Electricity Demand Natural Gas Other Energy Solid Waste (non-haz) Personnel Changes Administrative Changes Primary Product Electricity Usage Electricity Demand Natural Gas Other Energy Solid Waste (non-haz) Personnel Changes Administrative Changes Primary Product