IAC logo
IAC Assessment: TN0611
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: TN0611
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Tennessee
Assessment Year 1997
Principal Product Custom Houseboats
NAICS n/a
SIC 3732 - Boat Building And Repairing
Sales $10,000,000-$50,000,000
# of Employees 162
Plant Area (Sq.Ft.) 211,500
Annual Production 150 Pieces
Production Hrs. Annual 2,625
Location (State) KY
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $34,459 1,025,498 kWh $0.03
Electricity Demand $22,486 3,748 kW-months/year $6.00
Electricity Fees $2,086 - $ -
Natural Gas $37,715 9,637 MMBtu $3.91
TOTAL ENERGY COSTS $160,496
RECOMMENDED SAVINGS* $248,310 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $238,335
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Other Liquid (haz) Solid Waste (non-haz) Personnel Changes Primary Raw Material Primary Product Electricity Usage Electricity Demand Natural Gas Other Liquid (haz) Solid Waste (non-haz) Personnel Changes Primary Raw Material Primary Product
$ kWh $ kW-months/year $ MMBtu $ gal $ lb $ $ $ $ $ $
01: 4.111 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK Savings:
$201,410
Cost:
$28,000
$(-9,820) (-288,980) - - $(-1,740) (-446) - - - - $(-544,530) - - - $757,500 - $(-9,820)
(-288,980)
kWh
-
-
kW-months/year
$(-1,740)
(-446)
MMBtu
-
-
gal
-
-
lb
$(-544,530)
-
$
-
-
$
$757,500
-
$
02: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS Savings:
$34,735
Cost:
$41,885
$(-1,265) (-37,222) - - - - - - $42,000 - $(-6,000) - - - - - $(-1,265)
(-37,222)
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
$42,000
-
lb
$(-6,000)
-
$
-
-
$
-
-
$
03: 3.8142 DISTILL CONTAMINATED SOLVENTS FOR REUSE Savings:
$9,975
Cost:
$9,596
$(-150) (-4,396) - - - - $3,150 693 - - $4,320 - $2,655 - - - $(-150)
(-4,396)
kWh
-
-
kW-months/year
-
-
MMBtu
$3,150
693
gal
-
-
lb
$4,320
-
$
$2,655
-
$
-
-
$
04: 2.7232 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL Savings:
$1,330
Cost:
$3,240
- - - - $1,330 341 - - - - - - - - - - -
-
kWh
-
-
kW-months/year
$1,330
341
MMBtu
-
-
gal
-
-
lb
-
-
$
-
-
$
-
-
$
05: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$860
Cost:
-
$360 10,551 $500 84 - - - - - - - - - - - - $360
10,551
kWh
$500
84
kW-months/year
-
-
MMBtu
-
-
gal
-
-
lb
-
-
$
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$248,310
Cost:
$82,721
$(-10,875) (-320,047) $500 84 $(-410) (-105) $3,150 693 $42,000 - $(-546,210) - $2,655 - $757,500 - $(-10,875)
(-320,047)
kWh
$500
84
kW-months/year
$(-410)
(-105)
MMBtu
$3,150
693
gal
$42,000
-
lb
$(-546,210)
-
$
$2,655
-
$
$757,500
-
$
TOTAL IMPLEMENTED Savings:
$238,335
Cost:
$73,125
$(-10,725) (-315,651) $500 84 $(-410) (-105) - - $42,000 - $(-550,530) - - - $757,500 - $(-10,725)
(-315,651)
kWh
$500
84
kW-months/year
$(-410)
(-105)
MMBtu
-
-
gal
$42,000
-
lb
$(-550,530)
-
$
-
-
$
$757,500
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ gal $ lb $ $ $ $ $ $
Electricity Usage Electricity Demand Natural Gas Other Liquid (haz) Solid Waste (non-haz) Personnel Changes Primary Raw Material Primary Product Electricity Usage Electricity Demand Natural Gas Other Liquid (haz) Solid Waste (non-haz) Personnel Changes Primary Raw Material Primary Product