IAC logo
IAC Assessment: TN0614
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: TN0614
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Tennessee
Assessment Year 1997
Principal Product 24 feet and 28 feet wide double section prefabricated homes
NAICS n/a
SIC 2451 - Mobile Homes
Sales $10,000,000-$50,000,000
# of Employees 147
Plant Area (Sq.Ft.) 72,000
Annual Production 1,200 Pieces
Production Hrs. Annual 2,250
Location (State) TN
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $26,730 505,276 kWh $0.05
Electricity Demand $9,807 1,648 kW-months/year $5.95
Electricity Fees $420 - $ -
Natural Gas $24,409 3,331 MMBtu $7.33
TOTAL ENERGY COSTS $129,966
RECOMMENDED SAVINGS* $81,675 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $45,265
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Administrative Changes Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Administrative Changes
$ kWh $ kW-months/year $ MMBtu $ lb $ $ $ $
01: 4.4210 MODIFY CURRENT INCENTIVE PROGRAM Savings:
$35,750
Cost:
$10,000
- - - - - - - - $60,750 - $(-25,000) - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
$60,750
-
$
$(-25,000)
-
$
02: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS Savings:
$24,190
Cost:
$41,800
$(-560) (-18,757) - - - - $27,000 - $(-2,250) - - - $(-560)
(-18,757)
kWh
-
-
kW-months/year
-
-
MMBtu
$27,000
-
lb
$(-2,250)
-
$
-
-
$
03: 2.7231 USE RADIANT HEATER FOR SPOT HEATING Savings:
$16,200
Cost:
$9,300
- - - - $16,200 2,220 - - - - - - -
-
kWh
-
-
kW-months/year
$16,200
2,220
MMBtu
-
-
lb
-
-
$
-
-
$
04: 3.6192 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL Savings:
$4,875
Cost:
-
- - - - - - $4,875 - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$4,875
-
lb
-
-
$
-
-
$
05: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$340
Cost:
$340
$115 3,810 $225 24 - - - - - - - - $115
3,810
kWh
$225
24
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
06: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$320
Cost:
$580
$320 10,551 - - - - - - - - - - $320
10,551
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$81,675
Cost:
$62,020
$(-125) (-4,396) $225 24 $16,200 2,220 $31,875 - $58,500 - $(-25,000) - $(-125)
(-4,396)
kWh
$225
24
kW-months/year
$16,200
2,220
MMBtu
$31,875
-
lb
$58,500
-
$
$(-25,000)
-
$
TOTAL IMPLEMENTED Savings:
$45,265
Cost:
$51,100
$(-560) (-18,757) - - $16,200 2,220 $31,875 - $(-2,250) - - - $(-560)
(-18,757)
kWh
-
-
kW-months/year
$16,200
2,220
MMBtu
$31,875
-
lb
$(-2,250)
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ lb $ $ $ $
Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Administrative Changes Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Administrative Changes