Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Tennessee |
---|---|
Assessment Year | 1997 |
Principal Product | Gas and electric household cooking ranges |
NAICS | n/a |
SIC | 3631 - Household Cooking Equipment |
Sales | $10,000,000-$50,000,000 |
# of Employees | 280 |
Plant Area (Sq.Ft.) | 275,000 |
Annual Production | 160,000 Pieces |
Production Hrs. Annual | 6,000 |
Location (State) | TN |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $122,696 | 3,962,192 | kWh | $0.03 |
Electricity Demand | $97,347 | 11,651 | kW-months/year | $8.36 |
Electricity Fees | $5,584 | - | $ | - |
Natural Gas | $243,600 | 53,398 | MMBtu | $4.56 |
TOTAL ENERGY COSTS | $889,643 | |||
RECOMMENDED SAVINGS* | $57,325 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | - |
#|Description |
Savings Cost |
Status | Natural Gas | Water Disposal | Solid Waste (non-haz) | Administrative Changes | Primary Raw Material | Water Consumption | Natural Gas | Water Disposal | Solid Waste (non-haz) | Administrative Changes | Primary Raw Material | Water Consumption | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | MMBtu | $ | Tgal | $ | lb | $ | $ | $ | $ | $ | Tgal | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 4.321 OPTIMIZE PRODUCTION LOT SIZES AND INVENTORIES |
Savings: $24,900 Cost: $21,000 |
- | - | - | - | - | - | - | - | $24,900 | - | - | - |
- - MMBtu |
- - Tgal |
- - lb |
- - $ |
$24,900 - $ |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 3.5313 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE |
Savings: $22,800 Cost: $16,000 |
- | - | - | - | $22,800 | - | - | - | - | - | - | - |
- - MMBtu |
- - Tgal |
$22,800 - lb |
- - $ |
- - $ |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $5,800 Cost: $4,500 |
$5,800 | 1,260 | - | - | - | - | - | - | - | - | - | - |
$5,800 1,260 MMBtu |
- - Tgal |
- - lb |
- - $ |
- - $ |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $2,350 Cost: $4,050 |
$2,350 | 510 | - | - | - | - | - | - | - | - | - | - |
$2,350 510 MMBtu |
- - Tgal |
- - lb |
- - $ |
- - $ |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 3.3128 UTILIZE OTHER METHODS TO REMOVE CONTAMINANTS |
Savings: $1,475 Cost: $810 |
- | - | $346 | 63,550 | - | - | $975 | - | - | - | $154 | - |
- - MMBtu |
$346 63,550 Tgal |
- - lb |
$975 - $ |
- - $ |
$154 - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $57,325 Cost: $46,360 |
$8,150 | 1,770 | $346 | 63,550 | $22,800 | - | $975 | - | $24,900 | - | $154 | - | $8,150 1,770 MMBtu |
$346 63,550 Tgal |
$22,800 - lb |
$975 - $ |
$24,900 - $ |
$154 - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: - Cost: - |
- | - | - | - | - | - | - | - | - | - | - | - | - - MMBtu |
- - Tgal |
- - lb |
- - $ |
- - $ |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | MMBtu | $ | Tgal | $ | lb | $ | $ | $ | $ | $ | Tgal | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Natural Gas | Water Disposal | Solid Waste (non-haz) | Administrative Changes | Primary Raw Material | Water Consumption | Natural Gas | Water Disposal | Solid Waste (non-haz) | Administrative Changes | Primary Raw Material | Water Consumption |