IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Tennessee
Assessment Year 1997
Principal Product Dyed textiles
NAICS n/a
SIC 2269 - Finishing Plants, Nec
Sales $10,000,000-$50,000,000
# of Employees 400
Plant Area (Sq.Ft.) 350,000
Annual Production 180,000,000 Thousand Feet
Production Hrs. Annual 6,120
Location (State) NC
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $440,292 10,676,436 kWh $0.04
Electricity Demand $92,511 26,934 kW-months/year $3.43
Electricity Fees $16,524 - $ -
Natural Gas $953,378 185,482 MMBtu $5.14
Fuel Oil #6 $6,436 1,447 MMBtu $4.45
Coal $374,213 200,278 MMBtu $1.87
TOTAL ENERGY COSTS $2,497,852
RECOMMENDED SAVINGS* $94,175 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Coal Water Disposal Solid Waste (non-haz) Personnel Changes Administrative Changes Ancillary Material Cost Water Consumption Primary Product Electricity Usage Electricity Demand Natural Gas Coal Water Disposal Solid Waste (non-haz) Personnel Changes Administrative Changes Ancillary Material Cost Water Consumption Primary Product
$ kWh $ kW-months/year $ MMBtu $ MMBtu $ Tgal $ lb $ $ $ $ $ $ $ Tgal $ $
01: 2.2511 INSULATE BARE EQUIPMENT Savings:
$32,090
Cost:
$46,680
- - - - $23,430 4,595 $8,660 4,595 - - - - - - - - - - - - - - -
-
kWh
-
-
kW-months/year
$23,430
4,595
MMBtu
$8,660
4,595
MMBtu
-
-
Tgal
-
-
lb
-
-
$
-
-
$
-
-
$
-
-
Tgal
-
-
$
02: 2.2514 COVER OPEN TANKS Savings:
$19,880
Cost:
-
- - - - $12,800 2,510 $7,080 3,755 - - - - - - - - - - - - - - -
-
kWh
-
-
kW-months/year
$12,800
2,510
MMBtu
$7,080
3,755
MMBtu
-
-
Tgal
-
-
lb
-
-
$
-
-
$
-
-
$
-
-
Tgal
-
-
$
03: 4.421 MODIFY CURRENT INCENTIVE PROGRAM Savings:
$16,000
Cost:
$10,000
- - - - - - - - - - - - - - $(-5,000) - - - - - $21,000 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
Tgal
-
-
lb
-
-
$
$(-5,000)
-
$
-
-
$
-
-
Tgal
$21,000
-
$
04: 2.2135 REPAIR AND ELIMINATE STEAM LEAKS Savings:
$13,230
Cost:
$1,960
- - - - $8,520 1,670 $4,710 2,500 - - - - - - - - - - - - - - -
-
kWh
-
-
kW-months/year
$8,520
1,670
MMBtu
$4,710
2,500
MMBtu
-
-
Tgal
-
-
lb
-
-
$
-
-
$
-
-
$
-
-
Tgal
-
-
$
05: 3.5217 REUSE / RECYCLE/ SELL PAPER PRODUCTS Savings:
$8,415
Cost:
$6,640
- - - - - - - - - - $13,335 - $(-3,640) - - - $(-1,280) - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
Tgal
$13,335
-
lb
$(-3,640)
-
$
-
-
$
$(-1,280)
-
$
-
-
Tgal
-
-
$
06: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$3,200
Cost:
$990
$2,580 64,478 $620 180 - - - - - - - - - - - - - - - - - - $2,580
64,478
kWh
$620
180
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
Tgal
-
-
lb
-
-
$
-
-
$
-
-
$
-
-
Tgal
-
-
$
07: 3.4156 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE Savings:
$1,360
Cost:
$540
- - - - - - - - $970 562,000 - - - - - - - - $390 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
$970
562,000
Tgal
-
-
lb
-
-
$
-
-
$
-
-
$
$390
-
Tgal
-
-
$
TOTAL RECOMMENDED Savings:
$94,175
Cost:
$66,810
$2,580 64,478 $620 180 $44,750 8,775 $20,450 10,850 $970 562,000 $13,335 - $(-3,640) - $(-5,000) - $(-1,280) - $390 - $21,000 - $2,580
64,478
kWh
$620
180
kW-months/year
$44,750
8,775
MMBtu
$20,450
10,850
MMBtu
$970
562,000
Tgal
$13,335
-
lb
$(-3,640)
-
$
$(-5,000)
-
$
$(-1,280)
-
$
$390
-
Tgal
$21,000
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - - - - - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
Tgal
-
-
lb
-
-
$
-
-
$
-
-
$
-
-
Tgal
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ MMBtu $ Tgal $ lb $ $ $ $ $ $ $ Tgal $ $
Electricity Usage Electricity Demand Natural Gas Coal Water Disposal Solid Waste (non-haz) Personnel Changes Administrative Changes Ancillary Material Cost Water Consumption Primary Product Electricity Usage Electricity Demand Natural Gas Coal Water Disposal Solid Waste (non-haz) Personnel Changes Administrative Changes Ancillary Material Cost Water Consumption Primary Product