IAC Assessment: TN0626
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Tennessee
Assessment Year 1998
Principal Product Animal feed
NAICS n/a
SIC 2048 - Prepared Feeds, Nec
Sales $10,000,000-$50,000,000
# of Employees 54
Plant Area (Sq.Ft.) 110,000
Annual Production 325,000,000 Pounds
Production Hrs. Annual 8,736
Location (State) TN
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $140,002 4,467,761 kWh $0.03
Electricity Demand $126,184 15,803 kW-months/year $7.98
Electricity Fees $2,047 - $ -
Natural Gas $76,070 17,721 MMBtu $4.29
TOTAL ENERGY COSTS $388,202
RECOMMENDED SAVINGS* $160,886 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $5,395
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Solid Waste (non-haz) Personnel Changes Administrative Changes Primary Raw Material Electricity Usage Electricity Demand Solid Waste (non-haz) Personnel Changes Administrative Changes Primary Raw Material
$ kWh $ kW-months/year $ lb $ $ $ $ $ $
01: 4.445 INSTALL EQUIPMENT TO MOVE PRODUCT Savings:
$147,240
Cost:
$377,000
$(-15,000) (-498,242) - - - - $162,240 - - - - - $(-15,000)
(-498,242)
kWh
-
-
kW-months/year
-
-
lb
$162,240
-
$
-
-
$
-
-
$
02: 3.5311 RECOVER AND REUSE WASTE MATERIAL Savings:
$6,480
Cost:
$500
- - - - $3,480 50,000 - - - - $3,000 - -
-
kWh
-
-
kW-months/year
$3,480
50,000
lb
-
-
$
-
-
$
$3,000
-
$
03: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$2,860
Cost:
$4,550
$970 32,239 $1,890 228 - - - - - - - - $970
32,239
kWh
$1,890
228
kW-months/year
-
-
lb
-
-
$
-
-
$
-
-
$
04: 3.6192 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL Savings:
$2,535
Cost:
-
- - - - $7,410 325,000 - - $(-4,875) - - - -
-
kWh
-
-
kW-months/year
$7,410
325,000
lb
-
-
$
$(-4,875)
-
$
-
-
$
05: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,390
Cost:
-
$790 26,377 $600 72 - - - - - - - - $790
26,377
kWh
$600
72
kW-months/year
-
-
lb
-
-
$
-
-
$
-
-
$
06: 3.5217 REUSE / RECYCLE/ SELL PAPER PRODUCTS Savings:
$381
Cost:
$600
- - - - $381 - - - - - - - -
-
kWh
-
-
kW-months/year
$381
-
lb
-
-
$
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$160,886
Cost:
$382,650
$(-13,240) (-439,626) $2,490 300 $11,271 375,000 $162,240 - $(-4,875) - $3,000 - $(-13,240)
(-439,626)
kWh
$2,490
300
kW-months/year
$11,271
375,000
lb
$162,240
-
$
$(-4,875)
-
$
$3,000
-
$
TOTAL IMPLEMENTED Savings:
$5,395
Cost:
$4,550
$970 32,239 $1,890 228 $7,410 325,000 - - $(-4,875) - - - $970
32,239
kWh
$1,890
228
kW-months/year
$7,410
325,000
lb
-
-
$
$(-4,875)
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ lb $ $ $ $ $ $
Electricity Usage Electricity Demand Solid Waste (non-haz) Personnel Changes Administrative Changes Primary Raw Material Electricity Usage Electricity Demand Solid Waste (non-haz) Personnel Changes Administrative Changes Primary Raw Material