Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Tennessee |
---|---|
Assessment Year | 1998 |
Principal Product | Steel balls |
NAICS | n/a |
SIC | 3562 - Ball And Roller Bearings |
Sales | $10,000,000-$50,000,000 |
# of Employees | 59 |
Plant Area (Sq.Ft.) | 45,000 |
Annual Production | 6,000,000 Pounds |
Production Hrs. Annual | 6,000 |
Location (State) | TN |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $170,730 | 5,252,345 | kWh | $0.03 |
Electricity Demand | $117,148 | 12,612 | kW-months/year | $9.29 |
Electricity Fees | $(-68,466) | - | $ | - |
Natural Gas | $14,432 | 1,943 | MMBtu | $7.43 |
TOTAL ENERGY COSTS | $328,969 | |||
RECOMMENDED SAVINGS* | $88,800 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $10,800 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Solid Waste (non-haz) | Administrative Changes | Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Solid Waste (non-haz) | Administrative Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | Tgal | $ | lb | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 3.6112 USE FILTER AND DRYING OVEN TO REDUCE SLUDGE VOLUME |
Savings: $15,740 Cost: $48,585 |
$(-3,360) | (-111,958) | - | - | - | - | - | - | $19,100 | - | - | - |
$(-3,360) (-111,958) kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
$19,100 - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS |
Savings: $59,380 Cost: $17,000 |
$(-2,420) | (-80,598) | - | - | $5,400 | 1,643 | $56,400 | - | - | - | - | - |
$(-2,420) (-80,598) kWh |
- - kW-months/year |
$5,400 1,643 MMBtu |
$56,400 - Tgal |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 4.431 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY |
Savings: $10,800 Cost: $5,900 |
- | - | - | - | - | - | - | - | - | - | $10,800 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
- - lb |
$10,800 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS |
Savings: $2,580 Cost: $3,185 |
$750 | 24,912 | $1,830 | 168 | - | - | - | - | - | - | - | - |
$750 24,912 kWh |
$1,830 168 kW-months/year |
- - MMBtu |
- - Tgal |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS |
Savings: $300 Cost: $485 |
$300 | 9,965 | - | - | - | - | - | - | - | - | - | - |
$300 9,965 kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $88,800 Cost: $75,155 |
$(-4,730) | (-157,679) | $1,830 | 168 | $5,400 | 1,643 | $56,400 | - | $19,100 | - | $10,800 | - | $(-4,730) (-157,679) kWh |
$1,830 168 kW-months/year |
$5,400 1,643 MMBtu |
$56,400 - Tgal |
$19,100 - lb |
$10,800 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $10,800 Cost: $5,900 |
- | - | - | - | - | - | - | - | - | - | $10,800 | - | - - kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
- - lb |
$10,800 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | Tgal | $ | lb | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Solid Waste (non-haz) | Administrative Changes | Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Solid Waste (non-haz) | Administrative Changes |