IAC logo
IAC Assessment: TN0630
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: TN0630
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Tennessee
Assessment Year 1998
Principal Product Steel balls
NAICS n/a
SIC 3562 - Ball And Roller Bearings
Sales $10,000,000-$50,000,000
# of Employees 59
Plant Area (Sq.Ft.) 45,000
Annual Production 6,000,000 Pounds
Production Hrs. Annual 6,000
Location (State) TN
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $170,730 5,252,345 kWh $0.03
Electricity Demand $117,148 12,612 kW-months/year $9.29
Electricity Fees $(-68,466) - $ -
Natural Gas $14,432 1,943 MMBtu $7.43
TOTAL ENERGY COSTS $328,969
RECOMMENDED SAVINGS* $88,800 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $10,800
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Water Disposal Solid Waste (non-haz) Administrative Changes Electricity Usage Electricity Demand Natural Gas Water Disposal Solid Waste (non-haz) Administrative Changes
$ kWh $ kW-months/year $ MMBtu $ Tgal $ lb $ $
01: 3.6112 USE FILTER AND DRYING OVEN TO REDUCE SLUDGE VOLUME Savings:
$15,740
Cost:
$48,585
$(-3,360) (-111,958) - - - - - - $19,100 - - - $(-3,360)
(-111,958)
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
$19,100
-
lb
-
-
$
02: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS Savings:
$59,380
Cost:
$17,000
$(-2,420) (-80,598) - - $5,400 1,643 $56,400 - - - - - $(-2,420)
(-80,598)
kWh
-
-
kW-months/year
$5,400
1,643
MMBtu
$56,400
-
Tgal
-
-
lb
-
-
$
03: 4.4310 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY Savings:
$10,800
Cost:
$5,900
- - - - - - - - - - $10,800 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
lb
$10,800
-
$
04: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$2,580
Cost:
$3,185
$750 24,912 $1,830 168 - - - - - - - - $750
24,912
kWh
$1,830
168
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
lb
-
-
$
05: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$300
Cost:
$485
$300 9,965 - - - - - - - - - - $300
9,965
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
lb
-
-
$
TOTAL RECOMMENDED Savings:
$88,800
Cost:
$75,155
$(-4,730) (-157,679) $1,830 168 $5,400 1,643 $56,400 - $19,100 - $10,800 - $(-4,730)
(-157,679)
kWh
$1,830
168
kW-months/year
$5,400
1,643
MMBtu
$56,400
-
Tgal
$19,100
-
lb
$10,800
-
$
TOTAL IMPLEMENTED Savings:
$10,800
Cost:
$5,900
- - - - - - - - - - $10,800 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
lb
$10,800
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal $ lb $ $
Electricity Usage Electricity Demand Natural Gas Water Disposal Solid Waste (non-haz) Administrative Changes Electricity Usage Electricity Demand Natural Gas Water Disposal Solid Waste (non-haz) Administrative Changes