IAC logo
IAC Assessment: TN0631
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: TN0631
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Tennessee
Assessment Year 1998
Principal Product Chopped Fiber Glass
NAICS n/a
SIC 3229 - Pressed And Blown Glass, Nec
Sales $50,000,000-$100,000,000
# of Employees 230
Plant Area (Sq.Ft.) 362,000
Annual Production 120,000,000 Pounds
Production Hrs. Annual 8,760
Location (State) TN
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $3,354,612 140,894,492 kWh $0.02
Electricity Demand $1,117,834 206,581 kW-months/year $5.41
Electricity Fees $(-25,036) - $ -
Natural Gas $2,034,184 685,461 MMBtu $2.97
TOTAL ENERGY COSTS $6,850,934
RECOMMENDED SAVINGS* $608,611 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $5,830
#|Description Savings
Cost
Status Electricity Usage Other Liquid (haz) Solid Waste (non-haz) Administrative Changes By-product Production Electricity Usage Other Liquid (haz) Solid Waste (non-haz) Administrative Changes By-product Production
$ kWh $ gal $ lb $ $ $ $
01: 3.5313 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE Savings:
$494,000
Cost:
$32,000
- - - - $190,000 - - - $304,000 - -
-
kWh
-
-
gal
$190,000
-
lb
-
-
$
$304,000
-
$
02: 3.3128 UTILIZE OTHER METHODS TO REMOVE CONTAMINANTS Savings:
$89,750
Cost:
$45,600
- - $89,750 - - - - - - - -
-
kWh
$89,750
-
gal
-
-
lb
-
-
$
-
-
$
03: 4.4310 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY Savings:
$7,500
Cost:
$5,600
- - - - - - $7,500 - - - -
-
kWh
-
-
gal
-
-
lb
$7,500
-
$
-
-
$
04: 2.7131 ADD AREA LIGHTING SWITCHES Savings:
$6,606
Cost:
$10,900
$6,606 235,932 - - - - - - - - $6,606
235,932
kWh
-
-
gal
-
-
lb
-
-
$
-
-
$
05: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$5,830
Cost:
$7,750
$5,830 208,089 - - - - - - - - $5,830
208,089
kWh
-
-
gal
-
-
lb
-
-
$
-
-
$
06: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$4,925
Cost:
$4,725
$4,925 175,850 - - - - - - - - $4,925
175,850
kWh
-
-
gal
-
-
lb
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$608,611
Cost:
$106,575
$17,361 619,871 $89,750 - $190,000 - $7,500 - $304,000 - $17,361
619,871
kWh
$89,750
-
gal
$190,000
-
lb
$7,500
-
$
$304,000
-
$
TOTAL IMPLEMENTED Savings:
$5,830
Cost:
$7,750
$5,830 208,089 - - - - - - - - $5,830
208,089
kWh
-
-
gal
-
-
lb
-
-
$
-
-
$
Savings
Cost
$ kWh $ gal $ lb $ $ $ $
Electricity Usage Other Liquid (haz) Solid Waste (non-haz) Administrative Changes By-product Production Electricity Usage Other Liquid (haz) Solid Waste (non-haz) Administrative Changes By-product Production