IAC logo
IAC Assessment: TN0632
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: TN0632
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Tennessee
Assessment Year 1998
Principal Product Printed clothing Labels
NAICS n/a
SIC 2396 - Automotive And Apparel Trimmings
Sales $10,000,000-$50,000,000
# of Employees 471
Plant Area (Sq.Ft.) 117,000
Annual Production 1,500,000,000 Pounds
Production Hrs. Annual 8,760
Location (State) NC
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $271,960 9,936,108 kWh $0.03
Electricity Demand $189,282 20,158 kW-months/year $9.39
Electricity Fees $3,216 - $ -
Natural Gas $323,305 84,719 MMBtu $3.82
TOTAL ENERGY COSTS $865,058
RECOMMENDED SAVINGS* $68,890 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $52,750
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Water Disposal Solid Waste (non-haz) Primary Product Electricity Usage Electricity Demand Natural Gas Water Disposal Solid Waste (non-haz) Primary Product
$ kWh $ kW-months/year $ MMBtu $ Tgal $ lb $ $
01: 3.4155 METER WASTE WATER Savings:
$18,830
Cost:
$3,300
- - - - - - $18,830 - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$18,830
-
Tgal
-
-
lb
-
-
$
02: 2.7243 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS Savings:
$5,750
Cost:
$14,700
$5,750 221,278 - - - - - - - - - - $5,750
221,278
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
lb
-
-
$
03: 3.6192 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL Savings:
$7,020
Cost:
-
- - - - - - - - $7,020 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
$7,020
-
lb
-
-
$
04: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$1,890
Cost:
$3,260
- - - - $1,890 510 - - - - - - -
-
kWh
-
-
kW-months/year
$1,890
510
MMBtu
-
-
Tgal
-
-
lb
-
-
$
05: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$1,480
Cost:
$1,680
$690 26,377 $790 84 - - - - - - - - $690
26,377
kWh
$790
84
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
lb
-
-
$
06: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$1,520
Cost:
$1,260
$1,520 58,617 - - - - - - - - - - $1,520
58,617
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
lb
-
-
$
07: 4.4310 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY Savings:
$32,400
Cost:
$47,100
- - - - - - - - - - $32,400 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
lb
$32,400
-
$
TOTAL RECOMMENDED Savings:
$68,890
Cost:
$71,300
$7,960 306,272 $790 84 $1,890 510 $18,830 - $7,020 - $32,400 - $7,960
306,272
kWh
$790
84
kW-months/year
$1,890
510
MMBtu
$18,830
-
Tgal
$7,020
-
lb
$32,400
-
$
TOTAL IMPLEMENTED Savings:
$52,750
Cost:
$51,660
$1,520 58,617 - - - - $18,830 - - - $32,400 - $1,520
58,617
kWh
-
-
kW-months/year
-
-
MMBtu
$18,830
-
Tgal
-
-
lb
$32,400
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal $ lb $ $
Electricity Usage Electricity Demand Natural Gas Water Disposal Solid Waste (non-haz) Primary Product Electricity Usage Electricity Demand Natural Gas Water Disposal Solid Waste (non-haz) Primary Product