Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Tennessee |
---|---|
Assessment Year | 1998 |
Principal Product | Bonded urethane carpet pad |
NAICS | n/a |
SIC | 3086 - Plastics Foam Products |
Sales | $10,000,000-$50,000,000 |
# of Employees | 70 |
Plant Area (Sq.Ft.) | 107,000 |
Annual Production | 8,600 Tons |
Production Hrs. Annual | 6,006 |
Location (State) | TN |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $94,781 | 2,814,771 | kWh | $0.03 |
Electricity Demand | $79,589 | 9,210 | kW-months/year | $8.64 |
Electricity Fees | $2,752 | - | $ | - |
Natural Gas | $83,715 | 15,806 | MMBtu | $5.30 |
TOTAL ENERGY COSTS | $319,203 | |||
RECOMMENDED SAVINGS* | $171,950 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $169,840 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Other Liquid (haz) | Solid Waste (non-haz) | Personnel Changes | Primary Product | Electricity Usage | Electricity Demand | Other Liquid (haz) | Solid Waste (non-haz) | Personnel Changes | Primary Product | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | gal | $ | lb | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 4.423 MOVE PRODUCT USING MECHANICAL MEANS |
Savings: $135,200 Cost: $72,120 |
- | - | - | - | - | - | - | - | $135,200 | - | - | - |
- - kWh |
- - kW-months/year |
- - gal |
- - lb |
$135,200 - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 4.611 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE |
Savings: $24,975 Cost: $27,000 |
- | - | - | - | - | - | - | - | - | - | $24,975 | - |
- - kWh |
- - kW-months/year |
- - gal |
- - lb |
- - $ |
$24,975 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 3.7212 IMPROVED MATERIAL HANDLING (MIXING AND TRANSFER) |
Savings: $7,440 Cost: $400 |
- | - | - | - | $7,440 | 660 | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$7,440 660 gal |
- - lb |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $2,140 Cost: $2,765 |
$770 | 23,447 | $1,370 | 12 | - | - | - | - | - | - | - | - |
$770 23,447 kWh |
$1,370 12 kW-months/year |
- - gal |
- - lb |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS |
Savings: $2,110 Cost: $830 |
$1,310 | 39,566 | $800 | 7 | - | - | - | - | - | - | - | - |
$1,310 39,566 kWh |
$800 7 kW-months/year |
- - gal |
- - lb |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 3.5316 CONTRACT A WOOD PALLET RECYCLING COMPANY |
Savings: $85 Cost: $50 |
- | - | - | - | - | - | $85 | - | - | - | - | - |
- - kWh |
- - kW-months/year |
- - gal |
$85 - lb |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $171,950 Cost: $103,165 |
$2,080 | 63,013 | $2,170 | 19 | $7,440 | 660 | $85 | - | $135,200 | - | $24,975 | - | $2,080 63,013 kWh |
$2,170 19 kW-months/year |
$7,440 660 gal |
$85 - lb |
$135,200 - $ |
$24,975 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $169,840 Cost: $102,335 |
$770 | 23,447 | $1,370 | 12 | $7,440 | 660 | $85 | - | $135,200 | - | $24,975 | - | $770 23,447 kWh |
$1,370 12 kW-months/year |
$7,440 660 gal |
$85 - lb |
$135,200 - $ |
$24,975 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | gal | $ | lb | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Other Liquid (haz) | Solid Waste (non-haz) | Personnel Changes | Primary Product | Electricity Usage | Electricity Demand | Other Liquid (haz) | Solid Waste (non-haz) | Personnel Changes | Primary Product |