IAC Assessment: TN0641
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Tennessee
Assessment Year 1998
Principal Product Steel forgings and specialty tools
NAICS n/a
SIC 3462 - Iron And Steel Forgings
Sales $10,000,000-$50,000,000
# of Employees 76
Plant Area (Sq.Ft.) 55,000
Annual Production 12,000,000 Pounds
Production Hrs. Annual 5,355
Location (State) TN
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $263,417 8,283,705 kWh $0.03
Electricity Demand $367,463 37,365 kW-months/year $9.83
Electricity Fees $(-4,779) - $ -
Natural Gas $58,884 9,663 MMBtu $6.09
TOTAL ENERGY COSTS $692,800
RECOMMENDED SAVINGS* $473,580 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $10,500
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Other Liquid (non-haz) Solid Waste (non-haz) Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Other Liquid (non-haz) Solid Waste (non-haz) Personnel Changes Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ gal $ lb $ $ $ $
01: 4.423 MOVE PRODUCT USING MECHANICAL MEANS Savings:
$462,700
Cost:
$440,300
- - - - - - - - - - $462,700 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
-
-
lb
$462,700
-
$
-
-
$
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$5,810
Cost:
$5,000
$2,090 61,547 $3,720 348 - - - - - - - - - - $2,090
61,547
kWh
$3,720
348
kW-months/year
-
-
MMBtu
-
-
gal
-
-
lb
-
-
$
-
-
$
03: 3.3122 USE FILTRATION, CENTRIFUGING TO REMOVE CONTAMINANTS Savings:
$3,560
Cost:
$2,500
- - - - - - $183 765 - - - - $3,377 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$183
765
gal
-
-
lb
-
-
$
$3,377
-
$
04: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$1,130
Cost:
$980
$100 2,931 $1,030 96 - - - - - - - - - - $100
2,931
kWh
$1,030
96
kW-months/year
-
-
MMBtu
-
-
gal
-
-
lb
-
-
$
-
-
$
05: 2.2515 USE OPTIMUM THICKNESS INSULATION Savings:
$240
Cost:
$550
- - - - $240 40 - - - - - - - - -
-
kWh
-
-
kW-months/year
$240
40
MMBtu
-
-
gal
-
-
lb
-
-
$
-
-
$
06: 3.7131 USE A RAG RECYCLE SERVICE Savings:
$140
Cost:
-
- - - - - - - - $780 1,600 - - $(-640) - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
$780
1,600
lb
-
-
$
$(-640)
-
$
TOTAL RECOMMENDED Savings:
$473,580
Cost:
$449,330
$2,190 64,478 $4,750 444 $240 40 $183 765 $780 1,600 $462,700 - $2,737 - $2,190
64,478
kWh
$4,750
444
kW-months/year
$240
40
MMBtu
$183
765
gal
$780
1,600
lb
$462,700
-
$
$2,737
-
$
TOTAL IMPLEMENTED Savings:
$10,500
Cost:
$8,480
$2,190 64,478 $4,750 444 - - $183 765 - - - - $3,377 - $2,190
64,478
kWh
$4,750
444
kW-months/year
-
-
MMBtu
$183
765
gal
-
-
lb
-
-
$
$3,377
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ gal $ lb $ $ $ $
Electricity Usage Electricity Demand Natural Gas Other Liquid (non-haz) Solid Waste (non-haz) Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Other Liquid (non-haz) Solid Waste (non-haz) Personnel Changes Ancillary Material Cost