IAC logo
IAC Assessment: TN0647
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: TN0647
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Tennessee
Assessment Year 1999
Principal Product Thermo-formed plastic components
NAICS n/a
SIC 3089 - Plastics Products, Nec
Sales $10,000,000-$50,000,000
# of Employees 100
Plant Area (Sq.Ft.) 42,500
Annual Production 2,500,000 Pieces
Production Hrs. Annual 6,240
Location (State) TN
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $113,530 3,292,204 kWh $0.03
Electricity Demand $61,900 7,263 kW-months/year $8.52
Electricity Fees $1,820 - $ -
Natural Gas $9,736 1,856 MMBtu $5.25
TOTAL ENERGY COSTS $186,986
RECOMMENDED SAVINGS* $1,116,135 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $530
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Solid Waste (non-haz) Administrative Changes Electricity Usage Electricity Demand Solid Waste (non-haz) Administrative Changes
$ kWh $ kW-months/year $ lb $ $
01: 3.1182 MAKE A NEW BY-PRODUCT Savings:
$754,000
Cost:
$1,851,360
- - - - $2,590,000 4,080,000 $(-1,836,000) - -
-
kWh
-
-
kW-months/year
$2,590,000
4,080,000
lb
$(-1,836,000)
-
$
02: 3.5313 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE Savings:
$339,565
Cost:
$329,440
$(-7,680) (-232,708) $(-4,670) (-492) $376,875 376,875 $(-24,960) - $(-7,680)
(-232,708)
kWh
$(-4,670)
(-492)
kW-months/year
$376,875
376,875
lb
$(-24,960)
-
$
03: 4.421 MODIFY CURRENT INCENTIVE PROGRAM Savings:
$21,000
Cost:
$16,000
- - - - - - $21,000 - -
-
kWh
-
-
kW-months/year
-
-
lb
$21,000
-
$
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,040
Cost:
$500
$700 21,102 $340 3 - - - - $700
21,102
kWh
$340
3
kW-months/year
-
-
lb
-
-
$
05: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$530
Cost:
-
$300 9,086 $230 2 - - - - $300
9,086
kWh
$230
2
kW-months/year
-
-
lb
-
-
$
TOTAL RECOMMENDED Savings:
$1,116,135
Cost:
$2,197,300
$(-6,680) (-202,520) $(-4,100) (-487) $2,966,875 4,456,875 $(-1,839,960) - $(-6,680)
(-202,520)
kWh
$(-4,100)
(-487)
kW-months/year
$2,966,875
4,456,875
lb
$(-1,839,960)
-
$
TOTAL IMPLEMENTED Savings:
$530
Cost:
-
$300 9,086 $230 2 - - - - $300
9,086
kWh
$230
2
kW-months/year
-
-
lb
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ lb $ $
Electricity Usage Electricity Demand Solid Waste (non-haz) Administrative Changes Electricity Usage Electricity Demand Solid Waste (non-haz) Administrative Changes