IAC logo
IAC Assessment: TN0649
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: TN0649
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Tennessee
Assessment Year 1999
Principal Product Finished apparel
NAICS n/a
SIC 2261 - Finishing Plants, Cotton
Sales $10,000,000-$50,000,000
# of Employees 361
Plant Area (Sq.Ft.) 40,000
Annual Production 6,000,000 Pieces
Production Hrs. Annual 4,250
Location (State) TN
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $63,070 1,483,001 kWh $0.04
Electricity Demand $36,013 4,438 kW-months/year $8.11
Electricity Fees $2,970 - $ -
Natural Gas $125,746 28,212 MMBtu $4.46
TOTAL ENERGY COSTS $1,163,109
RECOMMENDED SAVINGS* $44,555 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Water Disposal Other Liquid (non-haz) Personnel Changes Primary Product Electricity Usage Electricity Demand Natural Gas Water Disposal Other Liquid (non-haz) Personnel Changes Primary Product
$ kWh $ kW-months/year $ MMBtu $ Tgal $ gal $ $ $ $
01: 4.4210 MODIFY CURRENT INCENTIVE PROGRAM Savings:
$15,000
Cost:
$16,370
- - - - - - - - - - $(-150,000) - $165,000 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
gal
$(-150,000)
-
$
$165,000
-
$
02: 3.7311 MAINTAIN MACHINES TO REDUCE LEAKS Savings:
$9,350
Cost:
$6,920
- - - - - - $340 13,000,000 $9,010 21,440 - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$340
13,000,000
Tgal
$9,010
21,440
gal
-
-
$
-
-
$
03: 3.5311 RECOVER AND REUSE WASTE MATERIAL Savings:
$8,380
Cost:
$15,300
- - - - $8,380 1,880 - - - - - - - - -
-
kWh
-
-
kW-months/year
$8,380
1,880
MMBtu
-
-
Tgal
-
-
gal
-
-
$
-
-
$
04: 2.2113 REPAIR OR REPLACE STEAM TRAPS Savings:
$5,140
Cost:
-
- - - - $5,890 1,320 - - - - $(-750) - - - -
-
kWh
-
-
kW-months/year
$5,890
1,320
MMBtu
-
-
Tgal
-
-
gal
$(-750)
-
$
-
-
$
05: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$4,500
Cost:
$2,830
$2,950 84,115 $1,550 168 - - - - - - - - - - $2,950
84,115
kWh
$1,550
168
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
gal
-
-
$
-
-
$
06: 2.2135 REPAIR AND ELIMINATE STEAM LEAKS Savings:
$2,185
Cost:
$100
- - - - $2,185 490 - - - - - - - - -
-
kWh
-
-
kW-months/year
$2,185
490
MMBtu
-
-
Tgal
-
-
gal
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$44,555
Cost:
$41,520
$2,950 84,115 $1,550 168 $16,455 3,690 $340 13,000,000 $9,010 21,440 $(-150,750) - $165,000 - $2,950
84,115
kWh
$1,550
168
kW-months/year
$16,455
3,690
MMBtu
$340
13,000,000
Tgal
$9,010
21,440
gal
$(-150,750)
-
$
$165,000
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
gal
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal $ gal $ $ $ $
Electricity Usage Electricity Demand Natural Gas Water Disposal Other Liquid (non-haz) Personnel Changes Primary Product Electricity Usage Electricity Demand Natural Gas Water Disposal Other Liquid (non-haz) Personnel Changes Primary Product