IAC logo
IAC Assessment: TN0656
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: TN0656
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Tennessee
Assessment Year 1999
Principal Product Rayon staple fiber
NAICS n/a
SIC 2923 -
Sales $50,000,000-$100,000,000
# of Employees 410
Plant Area (Sq.Ft.) 1,000,000
Annual Production 115,000,000 Pounds
Production Hrs. Annual 8,736
Location (State) TN
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $200,299 7,789,566 kWh $0.03
Electricity Demand $104,651 10,924 kW-months/year $9.58
Electricity Fees $(-17,475) - $ -
Coal $5,840,640 4,563,000 MMBtu $1.28
TOTAL ENERGY COSTS $6,436,619
RECOMMENDED SAVINGS* $874,150 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $327,320
#|Description Savings
Cost
Status Coal Solid Waste (non-haz) Personnel Changes Ancillary Material Cost Water Consumption Coal Solid Waste (non-haz) Personnel Changes Ancillary Material Cost Water Consumption
$ MMBtu $ lb $ $ $ $ $ Tgal
01: 3.4111 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION Savings:
$400,000
Cost:
$618,000
- - - - - - - - $400,000 - -
-
MMBtu
-
-
lb
-
-
$
-
-
$
$400,000
-
Tgal
02: 2.1212 OPERATE BOILERS ON HIGH FIRE SETTING Savings:
$175,220
Cost:
$82,400
$175,220 136,890 - - - - - - - - $175,220
136,890
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
Tgal
03: 3.4151 MINIMIZE WATER USAGE Savings:
$143,010
Cost:
$60,900
$48,400 29,000 - - - - - - $94,610 - $48,400
29,000
MMBtu
-
-
lb
-
-
$
-
-
$
$94,610
-
Tgal
04: 4.4430 INSTALL AUTOMATIC BOILER FUEL FEED SYSTEM Savings:
$130,100
Cost:
$137,500
- - - - $(-52,420) - $182,520 - - - -
-
MMBtu
-
-
lb
$(-52,420)
-
$
$182,520
-
$
-
-
Tgal
05: 3.5313 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE Savings:
$22,000
Cost:
-
- - $22,000 14,640,000 - - - - - - -
-
MMBtu
$22,000
14,640,000
lb
-
-
$
-
-
$
-
-
Tgal
06: 2.2511 INSULATE BARE EQUIPMENT Savings:
$2,020
Cost:
$3,560
$2,020 1,575 - - - - - - - - $2,020
1,575
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
Tgal
07: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$1,800
Cost:
$2,380
$1,800 1,410 - - - - - - - - $1,800
1,410
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
Tgal
TOTAL RECOMMENDED Savings:
$874,150
Cost:
$904,740
$227,440 168,875 $22,000 14,640,000 $(-52,420) - $182,520 - $494,610 - $227,440
168,875
MMBtu
$22,000
14,640,000
lb
$(-52,420)
-
$
$182,520
-
$
$494,610
-
Tgal
TOTAL IMPLEMENTED Savings:
$327,320
Cost:
$219,900
$175,220 136,890 $22,000 14,640,000 $(-52,420) - $182,520 - - - $175,220
136,890
MMBtu
$22,000
14,640,000
lb
$(-52,420)
-
$
$182,520
-
$
-
-
Tgal
Savings
Cost
$ MMBtu $ lb $ $ $ $ $ Tgal
Coal Solid Waste (non-haz) Personnel Changes Ancillary Material Cost Water Consumption Coal Solid Waste (non-haz) Personnel Changes Ancillary Material Cost Water Consumption